Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 42 …An advance ground team, led by Albert P. Crary, preceded the NYU group to Alamogordo Army…
  • p. 115 …OSI also developed an advanced Narcotics Investigations Course designed to teach the latest technics in combatting…
  • p. 206 …Dr Crazy and Dr Peoples were the advance people and scientific monitors for our project Dr…
  • p. 283 …Spilly was a consultant, and even in his advancing age he was still an enormous source…
  • p. 322 …20 On May 28, the advance party of the balloon group arrived by B-17.21…
  • p. 708 …in advance of balloon release and a second notice will be filed at the time of…
  • p. 709 B • FRASE II. (l) The type balloon to be used in this phase of the project…
  • p. 791 …Upon attaining the desired altitude, the auxilliary lifting balloons wife be released from the main balloon…
The method used heretofore is variation of balloon
load through changes in the amount of ballast used.
However. there are upper and lower limits on the
amount of ballast that can be used. due to 'the
strength limitations of the fabric. Also. the "height
sensitivity"; that is. the ratio of change in altitude
to Change in load. is not great enough to provide suit-
able choice of heights.
B. Another attack is to effect a change of volume by
making openings below the equator of the balloon.
The volume of gas contained in the balloon envelope
is then obviously limited.
c. If this method of height control proves to be un-
satisfactory. still other control mechanisms will be
sought.
The three objectives. with their indicated subdivisions. will be
pursued to better effect control of the balloon altitude. A parallel
pursuit will be the investigation of other balloon types and sizes. in
addition to the satisfactory General Mills Polyethylene models now in
use. Thus. plans for the future include both the development of control
devices currently under test and also a.broad. general study of 'the basic
components of constant-level balloon trains from the theoretical as well
as the operational viewpoint.
- 36 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.