Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
(Approximate)
where G • gross load
A chart, Figure 24, has beendrawn up, based on this equation, expressing free
lift as a percentage of gross load, allowing the rate of rise to be approximately
predetennined.
E. Ballast Requirements
The amount of ballast Which must be dropped through the manual
ballast valve to keep the balloon at its ceiling, can be approximately
determined by the following measurements: a balloon of similar size and
construction is inflated and its loss of lift with time is measured with
correction for variation of temperature. This inflation is not complete,
but is of the same magnitude as that of a balloon ready for release,
approximately 14%. of full inflation in the case of a General Mills balloon.
The loss of lift per hour, multiplied by a factor representing the increase
of the surface ~nich results from total inflation, is thus obtained. This
factor is the reciprocal of the fraction of inflation raised to the two-thirds
power for a spherical balloon, and is approximately the same for the tear-drop
shaped General Mills balloons.
Field experience has shown that ballast leak pre-set to slightly exceed
the computed loss of lift is insufficient. A bailast leak of double the
computed loss of lift has usually been adequate. It is believed that increased
liquid viscosity and valve closure caused by the ·colder temperatures of the
high atmosphere are responsible for the need for this higher ballast setting.
An investigation into temperature effects on the ballast release systems has
been started.
1he amount of ballast which must be released ~.t sunset to compensate
for the loss of superheat, may be computed as followu
- 19 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.