Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
may ditter markedly from the problems ot surface measurement. For example;
tor any instrument used on a floating balloon, same consideration must be
given to the effect of solar radiation on its behavior. As mentioned in
the discussion of the automatic ballast valve, this effect is especially
important in the action ot any aneroid or other capsule which is not com-
pletely temperature compensated. Since the floating balloon will remain
within one parcel of air, rising and falling and moving sidewise as iile
air does, temperature extremes will result tram radiation effects and lack
9
ot ventilation. One investigator has estimated that the temperatures to
be experienced by such a bQdy range tram -60°C after a night of radiation
to a maximum of .f.so0 c in direct sunlight. Two ways of partially circum-
venting the undesirable results of this feature are:
1. Temperature compensation of the pressure capsule for some pre-set
5
pressure. T:his compensation is only complete at one pressure.
2. A second method of reducing insolation effects is the use of
highly reflective shields.
The meiilods of height determination used so far are not completely
satisfactory. Pressure-heights have been obtained by 72 me. and 397 me.
radiosonde transmitters with long-lite battery packs. Difficulties have
been experienced in all long flights due to:
l. Signals being lost due to excessive range or to pOM•er failure.
2. ~~en the balloon begins to float and height oscillations result
from the action of the automatic balla.st valve, it is impossible
to identify the radiosonde contact (hence the pressure) using the
conventional baroswitch of the Diamond-Hinman type radiosonde.
These steps are now being taken to improve height measurements:
1. The addition to the .flight train or a light-weight barograph.
- 11 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.