Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
Flight 103 through llla These tlights•re released in January and Febrtary,
19i9trom Alamogordo, New Mexico to test the action of the combined ballast
controls (displacement switch and rate-of-ascent switch). Receiving units
were stationed at AlamogordoJ at Miami, Oklahoma and at Nashville, TennesseeJ
aircraft were used both te receive the signal and also to track and poaitian
the balloon by the use of the radio compass.
For the 1'irat time on these flights, a program tiwitch was used to permit
a single transmitter to transmit three temperature signals as 11811 as ballast-
now data and pressure information. By interrupting the pressure and ballast
data tor short intervale of temperature data, all of this information was
tele:metered with the AJI-1 (N.Y .u.) traniDili tter.
Aircraft reception of 600 miles was reported on these flights,. but ground
reception was limited to a:bout 250 miles, perhaps due to mountains surrot.mding
the receiving station.
llo significant data was obtained on four of these flights, and on two
more the principal objective of the flight was defeated by the excessive gas
loss from the balloons.
From the height-time curves of Flights 103 and 107 (Figures 50 and 51)
may be seen that even with constant ballast flow (at 2400 grams per hour)
Figure 50
-so-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.