The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 129 …6099 2 HQ AMC WRIGHT PAT 342-seA-6191 CAMBRIDGE LABS 342-A~ AMC HQ WRIGHT…
  • p. 228 …overhead and followed the balloons out to sea. I have no idea about the results that…
  • p. 235 …the regular 334 that we had at sea level. From that they could deduce the temperature…
  • p. 279 …actually located on the jurisdictional lines between Sea Girt and Springlake, New Jersey. It was an…
  • p. 280 …The Sea Girt Inn? A: Exactly. That's where John had his office, and I was…
  • p. 400 …alone 1a about 24,000.m1lea at sea level, aDd about '500 allea at 45,000…
  • p. 407 …five (25) feet at their ls.rgest sea-level diameter. The sonic unit was a combination…
  • p. 466 …hour when one-fifth inf~ated at sea level). One other type of balloon which has…
  • p. 490 …Let us, then, compare the rate of leakage at any given altitude with leakage at sea…
  • p. 492 …The leakage at any altitude may be expressed as a function of leakage at sea level…
  • p. 493 Comparing rete of leakage at 40,000 feet with leakage at sea level: ~ 188 .u§. - 0…
  • p. 495 …It a 20-foot diameter balloon~ full were tested at 10 sea level and found to…
  • p. 496 …At sea level this is equivalent to 5.32 ~r. for a 20-foot diameter balloon…
  • p. 502 …Using the rules of subsonic aerodynamics, Picard suggests that air at sea level escaping at 1333…
  • p. 503 …sea level (psi) escape velocity of air to produce back pressure of 1 atmosphere at sea…
  • p. 520 …to about 20 millibars and increased to sea-level pressure at different temperatures. The most comprehensive…
  • p. 654 …The height above mean sea level as determined fram pressure measurements used in this work with…
  • p. 686 …to a thtmble a.nd attached to re1n forced pCltches at alterna.te .sea.m.s…
  • p. 688 …lQr9e Ba.lloo n ~hould trQin de .sea nd to 101000'. 6 each.-Gene ral M1lls…
  • p. 736 …point at which the radiosonde reaches the sea surface. 2. Earlier attempts There have been numerous…
  • p. 737 …The balloons floated between the surface and 30,000 ft above sea level; those which reached…
  • p. 801 …Vet Gifford ;.;ho has 0 0' sea rescue boat this project is planning to use. Stayed…
  • p. 816 …Worzel working on gravity at sea. Saw Geo Woollard and the Ryders. Woollard after Guggenheim fellowship…
  • p. 887 …the launching site is markedly different from sea level, a shift in this curve is needed…
  • p. 925 …balloon at all times with respect to sea level. On this curve also it is customary…
  • p. 933 …The height above ~ean sea level as determined from pressure measurements used in this work with…
INSPECTOR GENERAL
DEPARTMENT 01' D£1'ENSE
•oo ARMY NAVY l:lftiVE
ARUNcrtON. VIRCINIA 22202·2184
Analysis FEB 2 3 1994
an4 !'oll.owup
MEMORA.~UH FOR: SEE DISTRIBUTION
Genoral Ac:c:ounti.nq Offic:a (GAO) Latter Dated
February 9, 1994, •aeccrds Kanaqement Procedur..
Dea.linq with Weather Balloon, Unknown Aircratt, and
similar Crash Xnc:identc~ (GAO Code 701034)-
NQTIFICATlON OF GAO R#VIEW
The DoD Directive 7 650.2 desiqnatas this of'.fice as the
central DoD liaison tor tasking, contro11ing, and monitoring GAO
survey, review, and report activities. The enclosed Information
~heet,describes the specific DoD procedures for taskinq GAO
surveys/reviews and the DoD primary action office (PAO)
responsibilities.
on February 15, 1.994, we received the enclosed official GAO
notif'ication letter on the subject effort. The GAO National.
Secur~ty and Inter.nationa1 Affairs Division (National Security
Analysis) is doinq the work. The review is at tha request of
Repreaentative steven H. Schitt (R-NM) •
Representative Schiff requested the GAO review two issues of
concern {1) the DoD records management proc:edures for crash
incidents involvinq weather ba1loons and unknown airc~t, such
as UFOs and ~oreign aircraf:t, and (2) the facta r.qardinq the
reported crash of tPt UFO in 1949 at Roswell, lfew Maxico. Si.nco
the UFO story appeared in an episode of the television program
"Unsolved MYsteries," Representative Schiff baa received many
requests tor an investigation into the alleged "DoD cover-up.•
Apparently, reports on the inc£dent ware attributed to a weather
balloon crash.
The GAO is anxious to respond to Representative Schiff's
request and to dispel any concerns that the DoD is beinq
unresponsive. For that reason, it is important that we identily
the correct DoD representatives so that the GAO can beqin. its
work. since the enclosed GAO notification letter did not mention
the Roswell incid~t or specifically site unknown aircraft as the
area of: interest, we have been unable to determine the
appropriate DoD primary and collateral action o~fices.

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.