Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
Flig}lt 102: Released f'rom Red Bank, New Jersey, 1023 EST, December 9, 1948
Not recovered
Flight 102 was the first teat given to a 30-foot, .ool" polyethylene bal-
loon manufactured by General Mills, Inc.J with this balloon a 30-kilogram pay-
load was successfully lifted to 58,000 feet. A combination rate-of-ascent
switch and displacement switch was used to control ballast flow, but no record
of ballast was made since the ballast meter was broken at launching.
Flight data was received by three ground stations, and the signal from the
AM-1 transmitter (with about 10 pounds of batteries) was received for about
400 miles. This was a good test of the distance to which a signal may be
transmitted by the AM-1 (N.Y.U) transmitter under daytime conditions. The
trajectory of this flight is Figure 48.
STEW .. !IT
ffi
M.!=..u
··~··01010,... ... .,
------·-· ····- --- ·• --~ ---1'
• Io!IAJIC:TORY- FLo•wT 10.! 1
RELI..ASED AT RED BANK, N.J.,
DEc:. 9-1~411- 1023ESr
+---~-- ----------- ·-
Figure 48
In the height-time curve (Figure 49) it is interesting to note the descent
Which began shortly before sunset. · There is reason to believe that this
fall was being checked by ballast flow. The normal descent atter a balloon
-58-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.