Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
during the sunset descent (caused when the superheated helium lost the sun's
heating ei'i'eot). A further descent of 5 mb (500 feet at this level) was re-
quired to start the tlow of ballast. By this time, the balloon had lost
considerable lift and in exchange had acquired a daw.nwara velocity of about
120 feet per minute. To check this descent a ballast f'low was required for
about 40 minutes. During the next hour the balloon 'W8.s buoyant and climbing
baok to the seal-off pressure of the automatic ballast valve. The ineffi-
ciency of' this valve system is demonstrated by the ballast which was lost
after the balloon had regained its buoyancy and had begun to rise. More
ballast was wasted than •·•s required to check the descent. Indeed, the
entire 3000 grams available was expended at this time, according to the evi-
dence of' the ballast meter.
On this flight there was no apparent change in the activation pressure of
the automatic ballast aneroid between the times when ballast flow began and
ended. This indicates that the entrapped air had not experienced any signi-
ficant temperature change during the two hours or ballast operation.
-49-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.