The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
Flight 88: Released from Alamogordo, New Mexico, 1241 MST, August 25, 1948
Recovered at Lovington, Texas
This flight was planned to measure the diffusion and leakage of lifting
gas through a 2Q-foot, .001 11 polyethylene balloon at 40,000 feet. A fixed-
leak orifice was set to flaw at 100 grams per hour, and an automatic ballast
valve was included to supply more ballast as demanded. This automatic valve
broke on release, and the flow of 100 grams per hour was not sufficient to
keep the balloon and equipment up.
Temperature data on this flight was obtained from thermistors inside the
balloon, inside the battery and in the free air. These data and the height-
time curve are shown in Figure 38. During the period from 1400 to 1530 when
=10
I 40
I 10 r-".. • , ' .
JIO 10 I
0
I/I
I -10
..
Figure 38
the balloon was slowly descending, the temperature of the gas increased with
respect to the free air temperature, and a differential of 150C was recorded
at 1530. With subsequent, more rapid descent, this differential was reduced,
presumably by ventilation. The batter~ box temperature remained above lOOC
after four hours aloft.
-46-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.