Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 42 …An advance ground team, led by Albert P. Crary, preceded the NYU group to Alamogordo Army…
  • p. 115 …OSI also developed an advanced Narcotics Investigations Course designed to teach the latest technics in combatting…
  • p. 206 …Dr Crazy and Dr Peoples were the advance people and scientific monitors for our project Dr…
  • p. 283 …Spilly was a consultant, and even in his advancing age he was still an enormous source…
  • p. 322 …20 On May 28, the advance party of the balloon group arrived by B-17.21…
  • p. 708 …in advance of balloon release and a second notice will be filed at the time of…
  • p. 709 B • FRASE II. (l) The type balloon to be used in this phase of the project…
  • p. 791 …Upon attaining the desired altitude, the auxilliary lifting balloons wife be released from the main balloon…
VII. CONCLUSIONS
Considerable experimental work has been done in conjunction with the
study ot balloons and controls. The description ot operating pro-
cedures and the use ot specially developed equipment is included in
Part II of this report, "Operations," (bound separately).
A summary of the results ot flights made to teat equipment and cont.rol1
is given in Part III, "SUJIID.ry of Flights." At this time the use of
thin polyethylene balloons with pressure-activated ballast controls
has been demonstrated effectively to meet the contract requirements.
Tests made on another contract have found controls consistently active
over 24 hours with an average pressure constancy of t2 mb. at 200 mb.
Even greater ballast efficiency has been found at higher altitudes
using the same pressure-activated controls.
-79-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.