Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 15 …Ramey Col William H. Blanchard Maj Gen Clements McMullen Brig Gen Donald N. Yates Albert P…
  • p. 29 …Similarly, two authors, William L. Moore and Charles Berlitz, also engaged in research which led them…
  • p. 31 …The Roswell Incident (1980) by William Moore and Charles Berlitz; "Crashed Saucers: Evidence in Search of…
  • p. 206 …incident"( it was in about 1980 that William Moore contacted me and asked questions about balloons…
  • p. 217 …the books that have been written by William Moore, and Randall Schmidt, and others, a lot…
  • p. 254 PROFESSOR MOORE - 6/8/94 38 diameter General Mills balloons. We had a very successful set…
  • p. 262 …One thing I should mention is that after I had visited from William Moore around •so…
  • p. 760 …Ben17 Itammenzind Ralph Morrell James Smith William lneer Duties Qualifications Computations & Equip- Undergraduate Elec. ment Construction…
of the motor-driven units was observed; current practice is
to provide adequate temperature insulation.
{4) Barograph
As a secondary pressure unit, a clock-driven be.rogre.ph he.s been
included on .me.ny flights. The instrument (shown in Figure 33)
Figure 33. Smoked drum be.rogre ph.
will provide up to 40 hours of pressure date. if recovered.
About 70,% of all those units flown to date have been recovered.
The performar.ce specifications are as follows:
(a) Rotation: one revolution every 12 hours
(b) Duration: 36 hours running time
(c) Pressure range: 500 to 5 mb.
(d) Accuracy: ~5 mb.
(e) Readability: 1.0mb. or approximately .22 mm on the drum
(f) Weight: 1000 grams
(g) Time accuracy: 10%
{h) Temperature compensation between 300C and -700C
Instruments have been built by Lange Laboratories to meet
these requirements (the time accuracy figure is questionable~
-73-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.