Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 7 …Computer Specialist, Office of the Secretary of the Air Force, Pentagon; George Cully, Historian, 81st Training…
  • p. 21 …FOR THE SECRETARY OF THE AIR FORCE FROM: SAF/AAZ 1720 Air Force Pentagon Washington, DC…
  • p. 64 …SAF/FMPF, Room 4C228, Pentagon SUBJECT: Central Point of Contact., GAO Code 701034 l. CPC Richard…
  • p. 67 OF"F'1C£ 0~ THE SECRETARY DEPARTMENT OF THE AIR FORCE WASHINGTON DC 20330-1000 MEMORANDUM…
  • p. 68 OFF'ICE OF" TME SECRETA~Y DEPARTMENT OF THE AIR FORCE WASHINGTON DC 20330-1000 MEMORANDUM…
  • p. 89 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE 09 Mar94 MEMORANDUMFORSAF/AAZ ATIENTION: Lt…
  • p. 174 …the Pentagon if he had a problem with that he could take it up with the…
  • p. 220 …Perhaps you have it from the Pentagon files already, from the AG files. Q: We have…
  • p. 282 …Following that, I spent more than three years on the Air Staff in the Pentagon. Q…
  • p. 317 …Force Pentagon Washington, DC 20330-1720 SUBJECT: Report of Findings on Balloon Research The following report…
of the motor-driven units was observed; current practice is
to provide adequate temperature insulation.
{4) Barograph
As a secondary pressure unit, a clock-driven be.rogre.ph he.s been
included on .me.ny flights. The instrument (shown in Figure 33)
Figure 33. Smoked drum be.rogre ph.
will provide up to 40 hours of pressure date. if recovered.
About 70,% of all those units flown to date have been recovered.
The performar.ce specifications are as follows:
(a) Rotation: one revolution every 12 hours
(b) Duration: 36 hours running time
(c) Pressure range: 500 to 5 mb.
(d) Accuracy: ~5 mb.
(e) Readability: 1.0mb. or approximately .22 mm on the drum
(f) Weight: 1000 grams
(g) Time accuracy: 10%
{h) Temperature compensation between 300C and -700C
Instruments have been built by Lange Laboratories to meet
these requirements (the time accuracy figure is questionable~
-73-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.