“Headquarters”29 pages
- p. 1 THE
ROSWELL
REPORT
Fact versus Fiction
in the
New Mexico Desert
Headquarters United States Air Force…
- p. 7 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical
Operating Agency, Bolling AFB, DC; John…
- p. 28 …the disc had been "flown to higher headquarters." That same
story also reported that a Roswell…
- p. 30 …These locations
include Fort Worth, Texas, the home of the Eighth Air Force Headquarters;
possibly Sandia…
- p. 71 DEPARTMENT OF THE AIR FORCE
HEADQUARTERS UNITED STATES AIR FORCE
MEMORANDUM FOR
FROM: AFiiN
SUBJECT:
References…
- p. 75 …DuBose says
officials at the Headquarters of the Eighth Air Force were
directed to tell the…
- p. 81 DEPARTMENT OF THE AIR FORCE
HEADQUARTERS UNITED STATES AIR FORCE
WASHINGTON DC
MEMORANDUM FOR SAF/AAZ…
- p. 89 DEPARTMENT OF THE AIR FORCE
HEADQUARTERS UNITED STATES AIR FORCE
09 Mar94
MEMORANDUMFORSAF/AAZ
ATIENTION: Lt…
- p. 107 …Colonel Loberg,
Headquarters, Eighth Air Force, arrived this date to
coordinate with S-3 and check…
- p. 108 …Boatright,
Headquarters, Eighth Air Force, arrived to coordinate with
Statistical Control on cost analysis.
16 July…
- p. 133 HEADQUARTERS, ARMY AIR FORCES
WASHINGTON
SUBJECT: Iuuance o! Ordera
!01 Couaa8.1ng General
.A.1r Materiel…
- p. 144 …we haven't s~uadron or grou~
headquarters should take their people away.
1:55 P…
- p. 159 …I did not make a report of this incident to my headquarters since I felt that…
- p. 165 …700 CIC was the CIC Headquarters.
- p. 166 …700 CIC was the Headquarters?
SC: Yes, I don't think I even made a report…
- p. 167 …I think this was taken at the Headquarters at Carswell.
RW: Yeah, that's right. That…
- p. 168 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were
going to…
- p. 177 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
- p. 178 …So that, to me, implies that this would have been
your CIC Headquarters also sent some…
- p. 227 …I was assigned, believe it or not, to Headquarters, Air
Force .•• I still have the Headquarters…
- p. 265 …on the basis of orders out of Headquarters
Army Air Force.
Q: While you were operating…
- p. 266 …These are the pictures taken in General Ramey's office,
8th Air Force Headquarters by a…
- p. 282 …Then after I left the headquarters of ARDC in
Baltimore, I spent four years at the…
- p. 318 …debris be flown to Eighth
Air Force Headquarters at Fort Worth AAF, TX, for his personal…
- p. 327 …Andrews AAF was headquarters
of the Army Air Forces Weather Service. It is also interesting to…
- p. 407 HEADQUARTERS FITZWILLIAM FORWARD
c/o Commander, Task Group 7.2
APO 187, c/o Postmaster
San…
- p. 409 …arrival of the explo-
sion sound wave. Headquarters FITZ\nlliArA FCRI1ARD furnished ARPACAS 3-1 and…
- p. 964 …Morgan, from Headquarters Eighth Air
Force, ;'las here to confer with the Engineering Officer,
Captain ?cterson…
- p. 984 …Marcellus Duffy eliminated
it and several others from the project when Headquarters U.S.
Army Air…
F. Flight Termination Gear
The rate of descent when controlled balloons are falling after
exhausting all ballast is sometimes as slow as 50 feet per minute.
This means that several hours might be required to fall through
the lanes of aircraft traffic, increasing considerably the hazard
to aircra.ft (admittedly very small). To minimize this possibility,
units have been added to the flight train to cause a rapid descent
after the balloon system has descended to some critical value, say
20,000 feet. One such destruction system, using a flight-termination
switch, is shown in Figure 21. It consists of a pressure-activated
switch, triggered on descent only, an explosive charge used to sever
KNOT&. Aaovs
A ioa D Snow CAN >lOotS
34' RP UIIE__...
OF 100* TEST
BRAIDEO NYLON
WaTH 2' SLACK
O&TAIL OF R•P L.I'NS
.... , .. 'T iMTb BAI.LOON
~
~ ld.ueLINECcouD •) 10 1lUE.
PI.AGE fW IfT .......ItCH IN
BEEN CUT ( IIOIJIIO Willi TIKAD)
"'-fi..aaHT"iRMMeAroaS..lttiRR
BALLOON ON FINAL DESCENT 10
2(\000 tT1 1Ml15I4EiltJC.IM(:,
I'Ulo\TlM& liME .. ntEAIR LANES,
lME HALF DI::F\.,t,l~D ~LCCllt lltD
ACTS A5 1rs CJWN PAR~C ...ITE
Figure 21.. Flight termination equipment.
the main load line, a rip line attached to ·the balloon near the
equator anQ. a snub line which takes up the strain after the load
has fallen a few feet.
-29-