Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 225 …Well, Boford was Navy, that was the Navy .•• Q: Like taking a Pi Ball reading now…
  • p. 226 …fabricate balloons for us. During that period we heard of the Navy project that was going…
  • p. 242 …But were any of those used as precursors to Mogul or ••. A: None whatsoever. That was…
  • p. 319 …Ewing had conducted considerable research for the Navy during World War II, studying, among other things…
  • p. 789 …for six hours using a non-extensible envelope vri th the addition of a balla.st…
  • p. 801 …Vet Gifford ;.;ho has 0 0' sea rescue boat this project is planning to use. Stayed…
  • p. 802 …tlyckoff, Hungerfield, 'faux and ~yself regarding Navy participation with us in Crossroads. Captain Kellogg of Weather…
  • p. 815 …Schneider up with 0 'Day to check use as NYU station. Alamoggrdo crew helped~.get helium…
The pen drops off the shelf at a safe distance below the ex-
pected pressure altitude and ballast then flows until the
preuure pen reaches the insulating section of the commutator.
In order to prevent the-overshoot mentioned as one undesirable
feature of the automatic ballast system, the high pressure
end of the insulator may correspond to the expected maximum
altitude of the balloon, any loss of lift due to impurities
or escape of lifting gas will cause the balloon to level off at
a ceiling within the ballast-dropping range. Continued ballast
dropping will result in the rise of the balloon. Thus, an over-
estimation of the ceiling is not as critical as in the case of
the previous system.
(3) Rate-of-Ascent Switch
Wit·h the displacement-switch control just described there re-
main the problems of ballast waste and balloon oscillation re-
sulting from discharge of ballast during rises of the balloon
after a descent has been checked. To eliminate this, a ballast-
control .witch acting on the rate of rise of the balloon is
put in series with the displacement ~itch to close the ballast
flow circuit only when the balloon is coming down or floating
below pressure altitude. When it is rising, no ballast flow is
permitted. This "rate-switch" is seen in Figure 12.
Wax
/Capillary
/ Tube
Volume
Chamber
Figure 12. Rate-of-ascent nitch.
-21-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.