Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 7 …Computer Specialist, Office of the Secretary of the Air Force, Pentagon; George Cully, Historian, 81st Training…
  • p. 21 …FOR THE SECRETARY OF THE AIR FORCE FROM: SAF/AAZ 1720 Air Force Pentagon Washington, DC…
  • p. 64 …SAF/FMPF, Room 4C228, Pentagon SUBJECT: Central Point of Contact., GAO Code 701034 l. CPC Richard…
  • p. 67 OF"F'1C£ 0~ THE SECRETARY DEPARTMENT OF THE AIR FORCE WASHINGTON DC 20330-1000 MEMORANDUM…
  • p. 68 OFF'ICE OF" TME SECRETA~Y DEPARTMENT OF THE AIR FORCE WASHINGTON DC 20330-1000 MEMORANDUM…
  • p. 89 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE 09 Mar94 MEMORANDUMFORSAF/AAZ ATIENTION: Lt…
  • p. 174 …the Pentagon if he had a problem with that he could take it up with the…
  • p. 220 …Perhaps you have it from the Pentagon files already, from the AG files. Q: We have…
  • p. 282 …Following that, I spent more than three years on the Air Staff in the Pentagon. Q…
  • p. 317 …Force Pentagon Washington, DC 20330-1720 SUBJECT: Report of Findings on Balloon Research The following report…
I. IN TRODUC TI ON
A. Contract Requirements
On November 1, 1946 the Research Division of the College of
Engineering of New York University entered into Contract
W28-099-ac-241 with Watson Laboratories of the Air Materiel
Command. Under this contract the University was commissioned
to design, develop and fly constant-level balloons to carry
instruments to altitudes from 10 to 20 kilometers, adjustable
at 2-kilameter intervals.
The following performance. was specified:
1. Altitude to be maintained within 500 meters.
2. Duration of constant level flight to be initially
6 to 8 hours minimum, eventually 48 hours.
3. The accuracy of pressure observation to be comparable
to that obtainable with the standard Army radiosonde
(t3-5 mb).
In addition to this balloon performance it was desired that:
4. A balloon-borne transmitter be developed for telemetering
of information from the balloon to suitable ground re-
ceivers.
5. Positioning of balloon during flight be determined by
ground tracking such as radar or radio direction-finding
or theodolite. ·
6. Appropriate meteorological data be collected and inter-
preted.
Following the first year of work the contract was renewed for
a 1-year period, and in addition to the provisions of the
original contract it was agreed that a total of 100 test flirftts
would be launched by the Universi~.
In September, 1948 a second renewal of the contract was ef±'ected.
With this renewal, which expires in March, 1949, it is ex-
pected that the development of equipment will be concluded.
Further extensions are under consideration whereby New York Uni-
versity will supply standardized flight gear and fli;ht ser-
vice personnel for routine test flights.
-5-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.