Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 1 THE ROSWELL REPORT Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 7 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 28 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 30 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 71 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR FROM: AFiiN SUBJECT: References…
  • p. 75 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 81 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 89 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE 09 Mar94 MEMORANDUMFORSAF/AAZ ATIENTION: Lt…
  • p. 107 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 108 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 133 HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Iuuance o! Ordera !01 Couaa8.1ng General .A.1r Materiel…
  • p. 144 …we haven't s~uadron or grou~ headquarters should take their people away. 1:55 P…
  • p. 159 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 165 …700 CIC was the CIC Headquarters.
  • p. 166 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 167 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 168 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 177 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 178 …So that, to me, implies that this would have been your CIC Headquarters also sent some…
  • p. 227 …I was assigned, believe it or not, to Headquarters, Air Force .•• I still have the Headquarters…
  • p. 265 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 266 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 282 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 318 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 327 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 407 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 409 …arrival of the explo- sion sound wave. Headquarters FITZ\nlliArA FCRI1ARD furnished ARPACAS 3-1 and…
  • p. 964 …Morgan, from Headquarters Eighth Air Force, ;'las here to confer with the Engineering Officer, Captain ?cterson…
  • p. 984 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
I. IN TRODUC TI ON
A. Contract Requirements
On November 1, 1946 the Research Division of the College of
Engineering of New York University entered into Contract
W28-099-ac-241 with Watson Laboratories of the Air Materiel
Command. Under this contract the University was commissioned
to design, develop and fly constant-level balloons to carry
instruments to altitudes from 10 to 20 kilometers, adjustable
at 2-kilameter intervals.
The following performance. was specified:
1. Altitude to be maintained within 500 meters.
2. Duration of constant level flight to be initially
6 to 8 hours minimum, eventually 48 hours.
3. The accuracy of pressure observation to be comparable
to that obtainable with the standard Army radiosonde
(t3-5 mb).
In addition to this balloon performance it was desired that:
4. A balloon-borne transmitter be developed for telemetering
of information from the balloon to suitable ground re-
ceivers.
5. Positioning of balloon during flight be determined by
ground tracking such as radar or radio direction-finding
or theodolite. ·
6. Appropriate meteorological data be collected and inter-
preted.
Following the first year of work the contract was renewed for
a 1-year period, and in addition to the provisions of the
original contract it was agreed that a total of 100 test flirftts
would be launched by the Universi~.
In September, 1948 a second renewal of the contract was ef±'ected.
With this renewal, which expires in March, 1949, it is ex-
pected that the development of equipment will be concluded.
Further extensions are under consideration whereby New York Uni-
versity will supply standardized flight gear and fli;ht ser-
vice personnel for routine test flights.
-5-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.