Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 9 …Appendices to the McAndrew Synopsis are identified by gray tabs which apear at the top right…
  • p. 28 …The rubber was smoky gray in color and scattered over an area about 200 yards in…
  • p. 38 …a thick, foil like metallic gray substance; a brittle, brownish-black plastic- like material, like Bakelite…
  • p. 43 …the ruptured and shredded neoprene would "almost look like dark gray or black flakes or ashes…
  • p. 205 …Some of the material would ahnost look like dark gray or black flakes or ashes after…
  • p. 222 …He talks about the smoky gray rubber ••. Q: Which these samples here, as you say, if…
  • p. 241 …There's a gray area here. I was certainly aware that what we were doing in…
  • p. 379 …that he might have found a smoky gray in color and scattered vatlon balloons on the…
(Type E preferred) J a rotating commutator ot two segments,
an insulator and a conductor; a six volt 1 rpm motor; and
a shelf' tor the pen arm. In calibration, the aneroid cell is
moved across the base by means or a screw which allows selec-
tion of' various altitudes for control.
Initially tbe pen arm rides on the shelf' during ascent so
that the circuit to the valve remains open until the balloon
approaches floating altitude. Several thousand feet before
ascent is completed the pen arm falls ott the shelf' closing
the ballast circuit (Fig. 2) and causing ballast now during
the final period of ascent. When the balloon reaches control
BALLAST
FLUID
R E L A Y 0 P E.R ATE D
VALVE
DISPLACEMENT SWITCH
5RPM MOTOR
I 11~---~
6 V. BATTERY
BALLAST, 0 0 NTRO L OJR CUI T
Fig. 2
Ballast· Control Circuit

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.