Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 15 …Ramey Col William H. Blanchard Maj Gen Clements McMullen Brig Gen Donald N. Yates Albert P…
  • p. 29 …Similarly, two authors, William L. Moore and Charles Berlitz, also engaged in research which led them…
  • p. 31 …The Roswell Incident (1980) by William Moore and Charles Berlitz; "Crashed Saucers: Evidence in Search of…
  • p. 206 …incident"( it was in about 1980 that William Moore contacted me and asked questions about balloons…
  • p. 217 …the books that have been written by William Moore, and Randall Schmidt, and others, a lot…
  • p. 254 PROFESSOR MOORE - 6/8/94 38 diameter General Mills balloons. We had a very successful set…
  • p. 262 …One thing I should mention is that after I had visited from William Moore around •so…
  • p. 760 …Ben17 Itammenzind Ralph Morrell James Smith William lneer Duties Qualifications Computations & Equip- Undergraduate Elec. ment Construction…
must be compensated for by decreasing the load on the system
to prevent descent to the ground.
This decreqse of load is carried out by dropping liquid ballast
as demanded by a prsssure activated ballast control switch.
This switch completes a circuit through a relay operated
ballast valve whenever the balloon system descends to a region
of pressure greater than that of its selected floating altitude.
Ballast is thus dropped and the system returned to floating
altitude.
On ~ghts made on another project since the termination of the
development phase of this project, the ballast control system
was standardized to include a pressure displacement switch and
an electrically operated ballast valve. The displacement switch
{Fig. 1) consists of a standard temperature compensated
aneroid cell and pen arm from a, radiosonde modulator
Fig. 1
Pressure Displacement Switch for Ballast Control

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.