Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 1 THE ROSWELL REPORT Fact versus Fiction in the New Mexico Desert Headquarters United States Air Force…
  • p. 7 Clinical Investigations and Life Sciences Division, Headquarters Air Force Medical Operating Agency, Bolling AFB, DC; John…
  • p. 28 …the disc had been "flown to higher headquarters." That same story also reported that a Roswell…
  • p. 30 …These locations include Fort Worth, Texas, the home of the Eighth Air Force Headquarters; possibly Sandia…
  • p. 71 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE MEMORANDUM FOR FROM: AFiiN SUBJECT: References…
  • p. 75 …DuBose says officials at the Headquarters of the Eighth Air Force were directed to tell the…
  • p. 81 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON DC MEMORANDUM FOR SAF/AAZ…
  • p. 89 DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE 09 Mar94 MEMORANDUMFORSAF/AAZ ATIENTION: Lt…
  • p. 107 …Colonel Loberg, Headquarters, Eighth Air Force, arrived this date to coordinate with S-3 and check…
  • p. 108 …Boatright, Headquarters, Eighth Air Force, arrived to coordinate with Statistical Control on cost analysis. 16 July…
  • p. 133 HEADQUARTERS, ARMY AIR FORCES WASHINGTON SUBJECT: Iuuance o! Ordera !01 Couaa8.1ng General .A.1r Materiel…
  • p. 144 …we haven't s~uadron or grou~ headquarters should take their people away. 1:55 P…
  • p. 159 …I did not make a report of this incident to my headquarters since I felt that…
  • p. 165 …700 CIC was the CIC Headquarters.
  • p. 166 …700 CIC was the Headquarters? SC: Yes, I don't think I even made a report…
  • p. 167 …I think this was taken at the Headquarters at Carswell. RW: Yeah, that's right. That…
  • p. 168 …I took it to 8th Air Force Headquarters, General Ramey was excited; they were going to…
  • p. 177 …I don't even want 700 CIC Headquarters to know we wasted our time on it…
  • p. 178 …So that, to me, implies that this would have been your CIC Headquarters also sent some…
  • p. 227 …I was assigned, believe it or not, to Headquarters, Air Force .•• I still have the Headquarters…
  • p. 265 …on the basis of orders out of Headquarters Army Air Force. Q: While you were operating…
  • p. 266 …These are the pictures taken in General Ramey's office, 8th Air Force Headquarters by a…
  • p. 282 …Then after I left the headquarters of ARDC in Baltimore, I spent four years at the…
  • p. 318 …debris be flown to Eighth Air Force Headquarters at Fort Worth AAF, TX, for his personal…
  • p. 327 …Andrews AAF was headquarters of the Army Air Forces Weather Service. It is also interesting to…
  • p. 407 HEADQUARTERS FITZWILLIAM FORWARD c/o Commander, Task Group 7.2 APO 187, c/o Postmaster San…
  • p. 409 …arrival of the explo- sion sound wave. Headquarters FITZ\nlliArA FCRI1ARD furnished ARPACAS 3-1 and…
  • p. 964 …Morgan, from Headquarters Eighth Air Force, ;'las here to confer with the Engineering Officer, Captain ?cterson…
  • p. 984 …Marcellus Duffy eliminated it and several others from the project when Headquarters U.S. Army Air…
period ot performance to 15 March 1950. A final report "n
development and testing ot constant altitude balloon·systems
was to be submitted to the Air Force. Modification #9 revised
the delivery address for reports.
Modification #10 of 1 May 19$0, increased contract funds to
continue field service and meteorological analysis work to 15
June 1950.
Modification #ll subsequently extended the period of performance
to the termination date ot 31 December 19.$0 and increased funds
accordingly.
B. Constant Altitude Balloon Sptems
Development of a system to maintain balloons at constant al-
titudes tor long periods of time was completed on 1.$ March 1949.
This develo~nt has been completely reported in "Technical
Report 93.02 11 (1) by this Research Division under "Section 1,
General".
Essentially the system as developed at New York University con-
sists of a constant volume balloon of thin polye~lene which,
when filled with hydrogen or heli,m, furnishes the lift for the
system. (Becaus-e ot the increased safety to personnel and equip-
ment, use of helium is to be recommended). The balloon is in-
flated with enot~h gas to balance the weight of the suspended
equipnent, plus a certain amount of "tree lift" which will cause
the system to ascend. When the balloon nears fioating altitude
and becomes full, the gas comprising the "free lift" will be
expelled through an open appendix at the bottom of the balloon.
The system is then at equilibrium at an altitude fixed by the
balloon volume. The ratio of molecular weights of the lifting
gas and air, density ot the surrounding air, and the tot&l balloon
load are as follows:
This state of equilibrium is broken, however, by changes in any
ot the above variables. Basically, losses of lift due to leakage
and diffusion of gas, and changes of temperature of the lifting
gas cause a change from equilibrium conditions.
Any variations causing an increa• in altitude will result merely
in a valving or gas from the fixed volume balloon and a slight
increase in altitude. Changes in the reverse direction, however,

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.