Documents / FOIA release

NRC FOIA-2017-0368 UFO records

The Black Vault · 44 pages · text from the file's own layer

This Black Vault release contains the U.S. Nuclear Regulatory Commission's March 23, 2017 response to John Greenewald's FOIA request 2017-0368 for UFO records collected since 1975. The NRC withheld identifying information. The records cover three allegation files. The first is a 2010 Region IV case about a former security officer who said a triangular UFO hovered over the protected area at Cooper Nuclear Station between 1986 and 1989. The other two are a 1997 letter claiming DoD flew nuclear-powered craft from New Mexico and a 1998 California complaint.

  • p. 4 Printed 711212010 RIV-201 O·A-01 01 Cooper DRS 29 DAYS Overall Responsible Branch PSB1…
  • p. 6 …Sometime between 1986 and 1989, an Unidentified Flying Object (UFO) violated the protected area at Cooper…
  • p. 7 …O'Grady, Vice President-Nuclear and Chief Nuclear Officer Nebraska Public Power- Cooper Nuclear Station · 72676…
  • p. 9 …NUCLEAR REGULATORY COMMISSION (NRC) REGARDING THE COOPER NUCLEAR STATION RE: ALLEGATION RIV-201 0-A-01…
  • p. 12 …We're working weird hours at Cooper right now due to flooding, ongoing event on site…
  • p. 13 ( Cooper Nuclear Station 0: {402) 825-3371 F: (402) 825-6941 C:l(b)(7)(C…
  • p. 14 …Jesse: Larsen, James: Gaddy, Vincent: Tavtor, Nick: Cooper Allegation 2010-0101 BEPR.doc Thursday, June 24…
  • p. 15 …201 0-A-01 01 Facility Name: Cooper Nuclear Station Responsible Oiv: DRS 0Yerall Respona+ble…
  • p. 16 …The Cl described an event that occurred during his employment as a security officer at Cooper…
  • p. 21 …June 13, 2010 An unidentified flying object violated the protected area at Cooper Nuclear Station sometime…
  • p. 22 …e 2 of3 Facility/Outside Org Name: Cooper Nuclear Station Received By: )(b)(?)(C) Receipt Date…
  • p. 23 …An unidentified flying object violated the protected area at Cooper Nuclear Station sometime between 1986 and…
Received Date
6/13/2010
Purpose of this ARB:
30 Days
7/ 1~2010
Initial ARB
Basis for a Subsequent ARB:
70 Days
8/22/2010
Does the Alleger OBJECT to the NRC requesting that the
licensee formally assess/evaluate the concem(s)?
~~~vs
9/11/2010
Yes X
120 Days
10111/2010
No N/A
If any of the following factors apply, this allegation shall not be submitted to the licensee for investigation
or review.
lnfonnation cannot be released in sufficient detail to the licensee without compromising the identity of the alleger or
confidential source.
The licensee could compromise an investigation or inspection because of knowledge gained from the <fiSCUSSions.
The allegation is made against the licensee's management or those parties who would nonnally receive and address the
all ation.
The basis of the allegation Is Information received from a Federal or State agency that does not approve ¢the infonnation
being released.
The licensee's allegation trend, quarrty of response(s), problem Identification and resolution, and/or cycle review results are
such that the NRC should independently evaluate the concem s .
The NRC evaluation would be more tilll(!ly and efficient - there is an ongoing or upcoming Inspection which could evaluate
the concem.
Significant pubnaCommisslon Interest warrants independent assessment of c::on<:em{s).
CHolland LBerger Jlarsen
. JKowalczik BHagar RAzua JWalker
,MHalre KFuller
IChairman Approval: ¥ £ ~ IDate: 6/3o /.20/0
Brief Overall Alleoation Summarv- if more than 3 Concerns use kevwords tooics subiect etc.: Provide
a summary or selected keywlrdsltopics/subject for the whole allegation's contents below. ***See the BEPR
Desktop Guide for assistance.
An Unidentified Flying Object (UFO) hovered over the protected area 21 years ago.
I

About this file

FOIA release, cited by the archive. The PDF is mirrored here; the original link is above. 44 pages are in the text index: search them above, or from the library's search.