Documents / Official release
This is Volume I of III of the Gemini VII voice communications transcript, covering pages 1 to 337 and marked Confidential. It records air-to-ground, ground-to-air and on-board exchanges beginning at lift-off. Early passages cover staging, orbit insertion and stationkeeping with the booster, which the crew reports is venting heavily, and they photograph it. Later passages near 116 hours hold the crew's detailed descriptions of airglow, stars and a sunrise seen from orbit.
“Borman”20 pages
Read from the scan by GLM-OCR; expect the odd misread word.
94:17:14 P Tape playback is on CONTINUOUS. 94:17:21 P Roger. 94:17:22 CC And you can get out your flight plan update book. I've got two items for you. 94:17:26 P Roger. 94:17:29 CC For your information, the Spacecraft VI sim flight is underway. 94:17:31 P Roger. We just passed over the Cape and with the telescope we could see them working on 19. 94:17:42 CC Very feverish activity, isn't it? 94:17:43 P Right. 94:17:59 P Okay. Go ahead with the update. 94:18:02 CC Roger. The first item is a deletion. D-9 at 96:11:35 is deleted. 94:18:16 P Roger. Understand the D-9 is deleted. 94:18:19 CC We'll get that later today. A new one in that same area is D-5: 96:13:00; Test Number 2. I have the instructions for that test when you're ready to copy. 94:18:34 P Test Number 2. 94:18:35 P Go ahead. 94:18:38 C Go ahead. 94:18:41 CC Okay. Number 1: calibrate on Venus; Number 2: if calibration successful, release the Cal button, track to occultation and report number of gain wheel turns to maximum from the calibration setting. Do you copy? 94:19:14 P Roger. We have it. 94:19:15 P Roger. Got it. 94:19:15 P Roger. Got it. ## CONFIDENTIAL
Official release, from the nara collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 341 pages are in the text index: search them above, or from the library's search.