Documents / Official release

Gemini VII Air-to-Ground Transcript Volume I: 5011500_VolumeI

· 341 pages · text by GLM-OCR

This is Volume I of III of the Gemini VII voice communications transcript, covering pages 1 to 337 and marked Confidential. It records air-to-ground, ground-to-air and on-board exchanges beginning at lift-off. Early passages cover staging, orbit insertion and stationkeeping with the booster, which the crew reports is venting heavily, and they photograph it. Later passages near 116 hours hold the crew's detailed descriptions of airglow, stars and a sunrise seen from orbit.

  • p. 51 …This is Borman dumping urination. Right now. 04:56:06 C It's not dumping. 04…
  • p. 65 …P ... Ha! 13:59:09 P Okay. Borman urination at 13 ... SC O₂ on at 16…
  • p. 72 …That last dump was the courtesy of Borman. In a minute, we will have Lovell. Stand…
  • p. 93 …I copy Borman at 06 plus 53 was a minus 4, Borman at a minus 10…
  • p. 94 …That's Borman. I couldn't see them this time.
  • p. 95 …13.3 Borman. Is that correct? 27:05:18 P Roger. Frank caught that out about…
  • p. 104 …30:57:18 C This is Borman urinating. Document urination. 30:57:20 P My! 30…
  • p. 127 …It says: "Astronauts Borman and Lovell report all is well aboard their Gemini VII." You know…
  • p. 149 …48:07:29 C This is Borman about to make a urine dump. Turn on the…
  • p. 169 …53:38:56 C On the S-8/D-13, Lovell missed 8 and Borman missed…
  • p. 187 …68:31:02 C This is Borman dumping urine also. 68:33:10 P Urine, dump…
  • p. 234 …13 before, but here they are again. Borman missed 7, Lovell missed 11 this morning. 77…
  • p. 240 …89:09:34 C Borman's dumping urine. Urine's approximately 1 minute. P Standing by…
  • p. 254 …92:38:18 CC The Gemini - Gemini VII story today says: "Borman Hitches GT-VII to…
  • p. 274 …94:43:04 C Borman about to dump urine. 94:46. 94:52:53 C Okay…
  • p. 302 …58 C S-8/D-13 score: Borman was -8, Lovell -7. 100:49:04 CC…
  • p. 307 …Colonel Frank Borman on the pulled muscle of his leg. 101:49:24 C ... my left…
  • p. 311 …102:19:52 P Borman dumps here. 102:19:59 P Borman dumping here. You have…
  • p. 320 …They want to discuss Lovell getting back into the suit and Borman getting out. Did you…
  • p. 332 …115:58:59 C Okay, it's also Borman's. 115:59:01 CC Roger. Concerning…

Read from the scan by GLM-OCR; expect the odd misread word.

## CONFIDENTIAL

00:16:16	P	Yes.
00:16:17	C	We're too close to that thing now, aren't we?
00:16:18	P	Yes.
00:16:19	C	What?
00:16:20	P	Yes.
00:16:23	CC	The latest on Bermuda data indicates your orbit as 87 by 177.
00:16:40	CC	We'd like to change the time when you put your radiators to FLOW.
00:16:45	C	Go ahead.
00:16:46	CC	At 37 minutes.
00:16:48	C	Go ahead. Right 37.
00:16:49	C	Roger. 37.
00:16:50	CC	Roger.
00:16:51	P	Hey, we're right where ... it's continually venting. That's why stationkeeping is costing more fuel than anticipated. We're within fifty feet of it though. The aft nozzle is venting slightly, but not bad.
00:16:52	CC	Do you happen to have your IVI's at cutoff?
00:16:54	C	... more fuel flow is indicated.
00:16:59	CC	Roger.
00:17:00	C	We're within 50 feet on the ball. The aft console is settled slowly, but not much.
00:17:07	CC	Roger.
00:17:14	C	All right, Jim.
00:17:19	P	Okay. Stand by. I have flight plan update - -
00:17:21	C	I have 18 minutes.

## CONFIDENTIAL

Cases discussed

About this file

Official release, from the nara collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 341 pages are in the text index: search them above, or from the library's search.