Documents / FOIA release
This unclassified Defense Intelligence Agency briefing, dated 16 December 2008, reports on the status of contract HHM402-08-C-0072 for Advanced Aerospace Weapon System Applications. The contract covers technical studies of unconventional aerospace weapon systems projected through 2050, in areas such as lift, propulsion, power generation, signature reduction and human effects. It states that Bigelow Aerospace Advanced Space Studies submitted excellent management plans in 12 technical areas and that the program is on track, on schedule and within cost.
4 UNCLASSIFIED On Track, On Schedule, and Within Cost (b)(3):10 USC 424 • Technical approaches being implemented by contractor are established, traditional techniques within intended scope of contract • Technical report deliverables will be under subcontract within 2 months and completed within 7 months • Equal amount monthly payments to contractor have commenced and allow for research subcontracts to be put into place quickly UNCLASSIFIED ■ Ill
Not linked to a story yet.
FOIA release, from the dia collection. The PDF is mirrored here; the original link is above. 9 pages are in the text index: search them above, or from the library's search.