This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 3 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS 341ST SPACE WING (AFSPC) 341 CS/SCBR (FOIA) 30 73d…
  • p. 7 Project How Now (Service Star), the testing of Mark 5 re- entry vehicles by higher headquarters…
  • p. 8 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 9 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 23 …report for February is submitted through your headquarters for Hq SAC (DM7B) in accordance with paragraph…
  • p. 24 …THIS HEADQUARTERS (DOFI, AND DM7B) WILL BE NOTIFIED OF THE TIME OF TEST. IF SHUTDOWNS OCCUR…
  • p. 25 …recommendations for improvement of local or higher headquarters procedures or directives. his & his man .. ROSS E…
  • p. 28 …IS CAUSE FOR GRAVE CONCERN TO THIS HEADQUARTERS. WE MUST HAVE AN IN-DEPTH ANALYSIS TO…
  • p. 47 …Flight are still be conducted by higher headquarters and the contractors. The results of all these…
  • p. 53 …This proposal was sent to Headquarters, SAC for concurrence. 155 (U) Headquarters, SAC in a message…
  • p. 55 …THIS HEADQUARTERS WILL CONTINUE TO ADVISE YOU OF OGAMA'S TEST PROGRAM AS TEST RESULTS AND…
  • p. 84 there was a power transfer. Headquarters, 15th AF ordered a test to determine if the channel…
  • p. 86 # DEPARTMENT OF THE AIR FORCE Headquarters 341st Strategic Missile Wing (SAC) Malmstrom Air Force Base, Montana…
  • p. 88 …Problems/Deficiencies Requiring Higher Headquarters Action: None B D Oralh C o l JOHN W CARROLL…
ATTACHMENT A FECP 528 Page 4

MINUTEMAN FACILITY CHANGE INITIATION REQUEST
MCL NO. 2827 DATE FECP NO. 528
(FOR BSSQ USE ONLY)
ORIGINATOR AND SERIAL NO. $\textcircled{1}$	DATE PREPARED $\textcircled{1}$	NEED DATE $\textcircled{1}$	INTERFACE AFFECTED $\textcircled{1}$
Boeing 720	31 Oct. 1966	15 Aug. 1967	YES X NO
SUBJECT $\textcircled{3}$
DC Supply for Isolation Relays - VRSA Channels 26 and 27 (LF)
DESCRIPTION OF CHANGE (USE ADDITIONAL SHEETS IF REQUIRED) $\textcircled{6}$
(ATTACH DWG'S AND SKETCHES)
Provide DC supply for the isolation relays being installed in VRSA channels 26 and 27 per ECP 1141. A typical DC supply circuit for these relays is shown on Sketch 1.
JUSTIFICATION (USE ADDITIONAL SHEETS IF REQUIRED) $\textcircled{7}$
The isolation relays are being installed in VRSA channels 26 and 27 per ECP 1141. The DC power required for these relays is to be supplied from the RPIE power system. This FCIR initiates the required RPIE change.
ESTIMATED COST $\textcircled{8}$ 4 ME at $11 = $44
Mat'l = 1
TOTAL = $45
DOCUMENTS AFFECTED $\textcircled{9}$	RECOMMENDED EFFECTIVITY: $\textcircled{9}$
BASE	CONSTR.	PHASE
Wing I All LFs
Wing II All LFs
Wing III All LFs
Wing V All LFs
VAFB All W133A LFs
HETF W133A LF
FIG. A AND FORM C Fig. A 1377 and 1329	WING IV All LFs
OTHER ICMGA 8026

$ \mathrm {H} _ {2} \mathrm {O} _ {2} $ $ \mathrm {B} _ {2} \mathrm {H} _ {5} $

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 88 pages are in the text index: search them above, or from the library's search.