Declassified 341st SMW unit histories

USAF via The Black Vault · 88 pages · text by OCR

This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
D337 (2016.4.24) (Continued from Page 3)

I. Publication Affected by this Change: (Continued)

T.C. Numbers:

Contract -740:

21M-LGM30B-2-21-3

21M-LGM30B-2-21-4

21M-LGM30A-4-1

LF & LCF INTRASITE CABLING (WING VI ONLY)

LF & LCF INTRASITE CABLING (WING V ONLY)

LGX30A/3 WEAPON SYSTEM ILLUSTRATED PARTS

BEARDOWN.

Pursuant to Part I, Item 8.3 of Contract AF04(094)-740, changes and/or revisions to the above Technical Orders to incorporate the effects of this ECP will be accomplished within the scope of basic Contract -740. Issuance of a CCB Directive for this ECP shall constitute authority for incorporation of effects of this chance in the affected Technical Manuals.

Y. Items in lines 16, 17, 18, 19 and 20 which are not checked (x) are not affected.

J. This change can be implemented with no interface effect on Associate Contractor equipment, drawings or documentation.

I. Neither hardware reliability nor the reliability contractual statement is affected by this change.

M. Contractor proposes to conduct a kit verification at STP III. This will avoid a delay in the delivery of operational kits expected to result from a kit proofing.

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 88 pages are in the text index: search them above, or from the library's search.