This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
## Line 19 - DATA/PUBLICATIONS: (Continued from Page 2)

T.O.'s Affected:
Contract TED:
21M-LGM30A-2-21	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - WING I
21M-LGM30A-2-21-1	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - VAFB
21M-LGM30B-2-21-2	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - WING III
21M-LGM30B-2-21-1	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - WING II
21M-LGM30B-2-21-3	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - WING IV
21M-LGM30B-2-21-4	LAUNCH FACILITY & LAUNCH CONTROL FACILITY
INTRASITE CABLING - WING V
21M-LGM30A-4-1	LGM30A/B WEAPON SYSTEM ILLUSTRATED PARTS BREAKDOWN
21M-LGM30A-4-1-1	LGM30A/B/F W.S. - CTL ILLUSTRATED PARTS BREAKDOWN

Line 20 - INTERFACE: (Continued from Page 2)

ICWGA 8420 records the interface effect on Boeing and Bendix equipment and interface documents.

Conduct of In-Process Review in lieu of FDR, CDR or Data package submittal is recommended. Technical approval at the In-Process Review shall constitute approval for the contractor to proceed with subsequent effort.

First Article Configuration Inspection (FACI) and Team Acceptance Review (DAR) are not recommended.