Documents / Document
This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.
“King”3 pages
Read from the scan by GLM-OCR; expect the odd misread word.
## Line 19 - DATA/PUBLICATIONS: (Continued from Page 2) T.O.'s Affected: Contract TED: 21M-LGM30A-2-21 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - WING I 21M-LGM30A-2-21-1 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - VAFB 21M-LGM30B-2-21-2 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - WING III 21M-LGM30B-2-21-1 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - WING II 21M-LGM30B-2-21-3 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - WING IV 21M-LGM30B-2-21-4 LAUNCH FACILITY & LAUNCH CONTROL FACILITY INTRASITE CABLING - WING V 21M-LGM30A-4-1 LGM30A/B WEAPON SYSTEM ILLUSTRATED PARTS BREAKDOWN 21M-LGM30A-4-1-1 LGM30A/B/F W.S. - CTL ILLUSTRATED PARTS BREAKDOWN Line 20 - INTERFACE: (Continued from Page 2) ICWGA 8420 records the interface effect on Boeing and Bendix equipment and interface documents. Conduct of In-Process Review in lieu of FDR, CDR or Data package submittal is recommended. Technical approval at the In-Process Review shall constitute approval for the contractor to proceed with subsequent effort. First Article Configuration Inspection (FACI) and Team Acceptance Review (DAR) are not recommended.
Document, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 88 pages are in the text index: search them above, or from the library's search.