This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
In accordance with the requirements of B&D 62-62 Maintenance Analysis Form C/C$_1$'s will be revised for Figure A's 1377M, 1377.1 and 1377MV. Revision will be for organizational and field level and depot Form C/C$_1$'s.

'Zero' Indenture Form C's will be revised to support in Process Design Review in lieu of CDR and PDR.

The revised Maintenance Analysis for Figure A 1377M, will be reviewed and Air Force Specialty Codes, Teen Codes and Task Proficiency Level Codes will be established or revised as required for the Personnel Data and Personnel Information section's.

Develop maintainability criteria for the revised Figure A's 1377M, 1377.1 and 1377MV.

Prepare a maintainability presentation for In Process Design Review.

Line 18 - OVERHAUL/REWORK METHODS: (Continued from Page 2) Depot tooling is not affected.

Line 18 - Nomenclature: (Continued from Page 2)

Revised Nomenclature will be requested for the Figure A's 1377 and 1377M.

Line 18 - SPARE PARTS EXHIBIT: (Continued from Page 2) The priced Spare Parts Exhibit will be affected by this change.

Line 18 - INTERCHANGEABILITY: (Continued from Page 2) Interchangeability is affected by this change.

Line 19. - TRAITERS: (Continued from Page 2) For the T-11 Trainer see the attached Training Equipment Supplement.