This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
transformers, and common mode suppression transformers for each Sensitive Command Network (SCN)/ Sensitive Information Network 151 (SIN) circuit pair. (U)

Boeing ECP 1141 dash 1 modifies the cable assembly set (launcher) by revising wiring to provide protection to Voice 152 Reporting Signal Assemble (VRSA) Channels 26 and 27. (U)

Boeing ECP 1141 dash 2 made anothermodification to the interconnecting box, by adding two isolation relays and reroutes 153 wiring to connect relays into VRSA monitoring circuits. (U)

The FCIR, MCL will provide for alteration of sensing at RPIE and of monitor circuits to re-establish correlation of sensing and monitor reporting. $ ^{154} $ (U)

Last quarter, the Wing's proposal for the removal of the Movement Security Alarm System of Re-entry vehicles G&G vans was agreed with by COAMA engineers. This proposal was sent to Headquarters, SAC for concurrence. 155 (U)

Headquarters, SAC in a message to OOAMA concurred with the Wing's proposal. It stated that the Movement Security System on