Documents / Document

Declassified 341st SMW unit histories

USAF via The Black Vault · 88 pages · text by OCR

This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
programs analysis has been finalized and correlated with SAMSO's EMP tests results in a joint conference.

On 27 - 28 July 1967, OOAMA conducted an engineering inspection at Malmstrom AFB of the interconnecting box, ESA panel, and missile away drawers at LCFs, Alpha 01 and Echo 01. The inspection found approximately 200 were checked. There were no set pattern of loose connections noted on SIN lines or Command lines. The interconnecting box was inspected for loose connections, arcing, burned areas, and tampering, with none discovered. Missiles away drawers involved in the incident were checked and found operation as designed. Thus no major problems were uncovered. 144

MISSILE INCIDENTS-Echo Flight Testing (EMP)

The direct relationship of EMP testing and Echo Flight Incident are intermixed, these EMP tests will be included in this section. (U)

SAMSO has been conducting EMP tests at Warren AFB, Wyo., but the results are unknown to this office. The tests made on Delta Flight were completed on all test objectives. SAMSO, with the completion of these tests, began EMP testing at the 564th

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 88 pages are in the text index: search them above, or from the library's search.