This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
PAGE 3: RUNNERBAD140
FLOW BACK TO THE GENERATOR. THE ORDERED INTERSITE CABLE (HIC) SHIELDS WOULD PROVIDE A PATH FOR THE GOUR. CURRENT THUS INDUCING VOLTAGE PULSES ON THE SIN LINES TO ALL LF'S. TESTING AT NRA HAS PROVEN THAT THERE IS SIGNIFICANT COUPLING BETWEEN THE SHIELDS OF THE SIN LINES AND THE STC LINE INTO THE C755P LOGIC COUPLER.

2. A CONFERENCE IS SCHEDULED AT BOEING ON 18 APRIL FOR THE TASK TEAM TO REVIEW THE PRELIMINARY TEST PLAN FOR LF E78 AT MALMSTROM. ALSO, A TEST PLAN WILL BE REVIEWED TO ACCOMPLISH THE TRANSFORMER FAILURE SIMULATION TESTS AT MALMSTROM. BOEING HAS COORDINATED WITH THE POWER COMPANY, AND HAS THEIR APPROVAL FOR THE TESTS. THE FINAL TRANSFORMER TEST PLAN WILL BE SUBMITTED TO OOAMA, AND SUBSEQUENTLY SAC AND SATAF COORDINATION WILL BE ACCOMPLISHED. THIS CONSENSUS OF THE TASK GROUP THAT THE TRANSFORMER TESTS SHOULD BE RUN AS SOON AS POSSIBLE SO THAT THE DATA ARE AVAILABLE FOR THE E-8 TEST PLAN DEVELOPMENT. THE PLAN IS AT THIS TIME TO INSTRUMENT TO HIC LINES AND POWER LINE INTO BOTH ONE E-FLIGHT LF AND LCC. GP-4.