This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

Read from the scan by GLM-OCR; expect the odd misread word.

PAGE 3: RUNNERBAD140
FLOW BACK TO THE GENERATOR. THE ORDERED INTERSITE CABLE (HIC) SHIELDS WOULD PROVIDE A PATH FOR THE GOUR. CURRENT THUS INDUCING VOLTAGE PULSES ON THE SIN LINES TO ALL LF'S. TESTING AT NRA HAS PROVEN THAT THERE IS SIGNIFICANT COUPLING BETWEEN THE SHIELDS OF THE SIN LINES AND THE STC LINE INTO THE C755P LOGIC COUPLER.

2. A CONFERENCE IS SCHEDULED AT BOEING ON 18 APRIL FOR THE TASK TEAM TO REVIEW THE PRELIMINARY TEST PLAN FOR LF E78 AT MALMSTROM. ALSO, A TEST PLAN WILL BE REVIEWED TO ACCOMPLISH THE TRANSFORMER FAILURE SIMULATION TESTS AT MALMSTROM. BOEING HAS COORDINATED WITH THE POWER COMPANY, AND HAS THEIR APPROVAL FOR THE TESTS. THE FINAL TRANSFORMER TEST PLAN WILL BE SUBMITTED TO OOAMA, AND SUBSEQUENTLY SAC AND SATAF COORDINATION WILL BE ACCOMPLISHED. THIS CONSENSUS OF THE TASK GROUP THAT THE TRANSFORMER TESTS SHOULD BE RUN AS SOON AS POSSIBLE SO THAT THE DATA ARE AVAILABLE FOR THE E-8 TEST PLAN DEVELOPMENT. THE PLAN IS AT THIS TIME TO INSTRUMENT TO HIC LINES AND POWER LINE INTO BOTH ONE E-FLIGHT LF AND LCC. GP-4.

BCASM: 67-580