Documents / Document
This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.
Read from the scan by GLM-OCR; expect the odd misread word.
TO RESOLVE THIS PROBLEM, OR TO DEFINITIVE ADEQUATE ENGINEERING ANALYSIS TASKS WITHOUT ADDITIONAL TESTING. A REVIEW OF AVAILABLE DATA STRONGLY SUGGESTS THIS TO BE A WING FACILITY. IT IS, CHEBEFORE, NECESSARY TO RUN THE PROPOSED TESTS AT MALSTROM, PREFERABLY AT ECHO 6. IT IS CURRENTLY BELIVED THAT FRUITFUL DATA WILL NOT EXIST UNTIL SUCH TIME AS THE NO-GO MODE CAN BE REPRODUCED AT LEAST AT THE LF LEVEL. 3. THE FOLLOWING PLAN OF ACTION WAS AGREED UPON BY ALL REPRESENTATIVES DEVELOP A TEST PLAN WHICH, AFTER ISOLATING AN LF FROM THE SYSTEM, ALLOW FOR THE APPLICATION OF STIMULI WHICH WILL REPRODUCE THE NO-GO AT THE LF LEVEL. AFTER ANALYSIS OF SUCH TEST DATA, PROCEDING AS REQUIRED TO TEST OR ANALYZE AT THE LCF LEVEL. THE TASK GROUP WILL CONVENE AT BOEING, SEASTER ON 4 APRIL TO DEVELOP A TEST PLAN AND PROCEDURES. SUCH PLAN WILL INCLUDE EQUIPMENT REQUIREMENTS, LF ISOLATION PROCEDURES, DEFINE TESTS TO BE PREFORMED, AND BE REVIEWED FOR SAFETY. THE PLAN WILL RECEIVE SAFETY CLEARANCE THROUGH CONE, AND WILL BE COORDINATED WITH SAC AS REQUIRED. COMPLETION DATE FOR THE PLAN IS AIMED AT 5 MAY 1967. THE PLAN WILL BE DEVELOPED AND PROTOTYPED, AT THE NRA FACILITY AT BOEING. 4. ADDITIONAL INVESTIGATIVE ENGINEERING STUDIES ARE IN PROCESS, AND WILL CONTINUE. BOEING IS ATTENPTING TO OBTAIN AN EXHIBIT 7KVA TRANS- PAGE 5 RUNNING A9054 FORMER WHICH WAS REPORTED TO HAVE SHORTED A Few HOURS AFTER THE INCIDENT. A TEARDOWN REPORT ON THE TRANSFORMER WILL BE DEVELOPED BY BOEING ENGINEERING. DEFENDENT UPON THE ANALYSIS OF THIS TRANSFORMER AND ITS FAILURE MODE, ADDITIONAL TESTS MAY BE REQUESTED SIMILAR TO THE POWER TESTS RUN ON 28 MARCH 1967, AT MALSTROM WITH THE ADDED TRANSFORMER FAILURE DE SIMULATION. YOU WILL BE FURTHER ADVISED WITH RESPECT TO THIS ACTIVITY. 5. CONCURRENT IN THE USE OF ECHO 3 FOR TESTING OUTLINED IN PARA THREE (3) IS REQUESTED. PLANNING FACTORS AT THIS TIME ARE FOR A PERIOD OR SIX WEEKS BEGINNING 19 MARY 1967. YOU WILL BE ADVISED OF ANY SHIFT IN THESE TARGET DATES. GRP-4.
Document, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 88 pages are in the text index: search them above, or from the library's search.