This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 26 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 28 …19 C-208 RUNNBAA/AFPRO BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF BT 9…
  • p. 29 …APB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUWJABA/BSD NORTON AFB CALIF C GONE…
  • p. 33 …The group was to reconvene at Boeings' Seattle plant on 4 April 67 for development of…
  • p. 42 …DURING TESTING AT BOEING, SEATTLE. A 30 MICRO SECOND PULSE TO 10 TORG VOLT SQUARE WAVE…
  • p. 44 …BOX 1915 - SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 68 …BROADWAY SEATTLE 24, WASHINGTON ENGINEERING CHANGE PROPOSAL 1 MODEL OF THE MODEL Figure A 1248 VES…
  • p. 70 …BOX 1955 SEATTLE, WASH. 9824 (BOE 720) ENGINEERING CHANGE PROPOSAL FACILITY DATE 27 December 1966 1…
  • p. 79 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
  • p. 80 …AFB MONT RUWMDAA/APPRO THE BOEING CO SEATTLE WASH RUN 4804/NORTH AMERICAN AUTONETICS DIV ANAHEIM…
  • p. 81 …THE TASK GROUP WILL CONVENE AT BOEING, SEATTLE ON 4 APRIL TO DEVELOP A TEST PLAN…
1. FOR ALL. THIS IS AUTHORITY TO CONDUCT THE POWER SWITCHING TEST TO AID IN DETERMINING THE CAUSE OF THE ECHO FLIGHT SHUTDOWN. PROCEDURES OUTLINED IN REFERENCED ZIPPO MESSAGE WILL APPLY. SYSTEM SHOULD BE IN CLOSEST CONFIGURATION POSSIBLE TO CONDITIONS THAT
2. FOR ALL. OONE AS TEAM CHIEF. WILL DETERMINE CONDITIONS, TIME OF TEST AND COMPOSITION OF INVESTIGATION TEAM. INSTRUCTIONS CONTAINED IN OONE 20321 WILL BE RECONFIRMED AS POWER SWITCHING TEST MAY CONFLICT WITH PROPOSED MEETING.
3. FOR ALL. SHOULD SHUTDOWN OCCUR. ANALYSIS SHOULD BE CONDUCTED PRIOR TO RETURNING SITES TO ALERT. 51 STRAT MSLING PROPOSAL OF FOUR SITES RETURNED TO ALERT PER DAY SHOULD BE ADHERED TO IN ORDER TO AVOID PROLONGED OFF ALERT TIME.
4. FOR 15AF AND 341SMW. THIS HEADQUARTERS (DOFI, AND DM7B) WILL BE NOTIFIED OF THE TIME OF TEST. IF SHUTDOWNS OCCUR AS A RESULT OF THIS TEST A SCHEDULE OF PROPOSED RETURN TO ALERT IS ALSO REQUIRED.