Documents / Document

Declassified 341st SMW unit histories

USAF via The Black Vault · 88 pages · text by GLM-OCR

This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 3 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS 341ST SPACE WING (AFSPC) 341 CS/SCBR (FOIA) 30 73d…
  • p. 7 Project How Now (Service Star), the testing of Mark 5 re- entry vehicles by higher headquarters…
  • p. 8 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 9 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 23 …report for February is submitted through your headquarters for Hq SAC (DM7B) in accordance with paragraph…
  • p. 24 …THIS HEADQUARTERS (DOFI, AND DM7B) WILL BE NOTIFIED OF THE TIME OF TEST. IF SHUTDOWNS OCCUR…
  • p. 25 …recommendations for improvement of local or higher headquarters procedures or directives. his & his man .. ROSS E…
  • p. 28 …IS CAUSE FOR GRAVE CONCERN TO THIS HEADQUARTERS. WE MUST HAVE AN IN-DEPTH ANALYSIS TO…
  • p. 47 …Flight are still be conducted by higher headquarters and the contractors. The results of all these…
  • p. 53 …This proposal was sent to Headquarters, SAC for concurrence. 155 (U) Headquarters, SAC in a message…
  • p. 55 …THIS HEADQUARTERS WILL CONTINUE TO ADVISE YOU OF OGAMA'S TEST PROGRAM AS TEST RESULTS AND…
  • p. 84 there was a power transfer. Headquarters, 15th AF ordered a test to determine if the channel…
  • p. 86 # DEPARTMENT OF THE AIR FORCE Headquarters 341st Strategic Missile Wing (SAC) Malmstrom Air Force Base, Montana…
  • p. 88 …Problems/Deficiencies Requiring Higher Headquarters Action: None B D Oralh C o l JOHN W CARROLL…

Read from the scan by GLM-OCR; expect the odd misread word.

## Continuous

to the Glengarry substation at Lewistown and the other to the Harlowton substation. The Glengarry substation feeds the Hilger substation with 50 KV lines and Hilger feeds the Winifred substation with 50 KV lines. The sites are fed by 7.2 KV lines. (U)

A 7.2 KV transformer shorted in the line to site E-3 at 1450, 16 March 67. This transformer is located on a farm two miles south of the Winifred substation. Automatic reclosure switches at Winifred substation opened, and were reclosed manually after transformer replacement later in the day. This caused the Brine Chiller problem at E-1. The transformer was in the West phase. It was not determined which phase this corresponds to at the sites. Sites E-3, E-5, E-6, E-9, and E-10 transferred to Standby Power. Sites E-1 transferred to Direct Current (DC) operation. (U)

On 28 March 67, the 341st SMW in conjunction with the Montana Power Company conducted a switching test on the 50 KV high voltage line between the Harlowton and Glengarry substations. The test was performed at the request of OOAMA/OONE as a part of the initial Echo Flight incident investigation performed at Malmstrom. The intent of the test was to verify correlation, if possible, between high voltage switching and launch facility shutdown or other launch facility faults. (U)

About this file