This Black Vault release contains the Air Force's 2001 response from the 341st Space Wing FOIA office at Malmstrom AFB, Montana, to a request about the 16 March 1967 Echo Flight missile shutdown, with excerpts from 341st Strategic Missile Wing histories covering 1967 to early 1968. The histories say all ten Echo Flight launch facilities lost strategic alert almost simultaneously. Investigators could not find a logical cause and found rumors of UFOs near Echo Flight to be unfounded.

  • p. 3 # DEPARTMENT OF THE AIR FORCE HEADQUARTERS 341ST SPACE WING (AFSPC) 341 CS/SCBR (FOIA) 30 73d…
  • p. 7 Project How Now (Service Star), the testing of Mark 5 re- entry vehicles by higher headquarters…
  • p. 8 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 9 …the 341st SMW was advised that SAC Headquarters had called in OOAMA support for a complete…
  • p. 23 …report for February is submitted through your headquarters for Hq SAC (DM7B) in accordance with paragraph…
  • p. 24 …THIS HEADQUARTERS (DOFI, AND DM7B) WILL BE NOTIFIED OF THE TIME OF TEST. IF SHUTDOWNS OCCUR…
  • p. 25 …recommendations for improvement of local or higher headquarters procedures or directives. his & his man .. ROSS E…
  • p. 28 …IS CAUSE FOR GRAVE CONCERN TO THIS HEADQUARTERS. WE MUST HAVE AN IN-DEPTH ANALYSIS TO…
  • p. 47 …Flight are still be conducted by higher headquarters and the contractors. The results of all these…
  • p. 53 …This proposal was sent to Headquarters, SAC for concurrence. 155 (U) Headquarters, SAC in a message…
  • p. 55 …THIS HEADQUARTERS WILL CONTINUE TO ADVISE YOU OF OGAMA'S TEST PROGRAM AS TEST RESULTS AND…
  • p. 84 there was a power transfer. Headquarters, 15th AF ordered a test to determine if the channel…
  • p. 86 # DEPARTMENT OF THE AIR FORCE Headquarters 341st Strategic Missile Wing (SAC) Malmstrom Air Force Base, Montana…
  • p. 88 …Problems/Deficiencies Requiring Higher Headquarters Action: None B D Oralh C o l JOHN W CARROLL…

Read from the scan by GLM-OCR; expect the odd misread word.

the deputy commander was turned away from the console to brief the commander who had just been awakened from sleep. The commander was the first to see the faults. 74

Channel 50 data was extracted from sites E-7 and E-8 immediately after the shutdown of the entire flight. Analysis of this data determined that both sites were shutdown as a result of external influence to the G&C, no No-Go's were deltected by the G&C. Although E-8 had indications of a previous Monitor check No-Go it was not the cause of shutdown at this time. This was determined by information contained in sector 54 which said that subsequent to the last No-Go the G&C had completed an iteration routine which is performed approximately 2 hours and 30 minutes into a restart. Had a G&C No-Go caused this shutdown, the Discrete Input "A" (DIA) word would have been placed in this sector. $ ^{75} $ (U)

On Sunday, 19 March 67, a team was dispatched to sites E-2 and E-9 to dump channel 50 data. These two sites were in strategic alert at this time but were selected because they had never experienced a restart since the last time that a maintenance tape had been used. Information from the No-Go sectors of channel 50 indicated that these G&C's had never entered a No-Go loop at any time. This hardens the case against a No-Go causing a shutdown of the flight. If a No-Go had shutdown the flight, it would have