Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 16 …An RB-29 lost in the Sea of Japan on 13 June 1952 was probably also…
  • p. 38 …off to about 6 percent of its sea-level thrust. Finally, low structural load factors, like…
  • p. 75 …with a boiling point of 300T at sea level. Manufacturing this special fuel required petroleum byproducts…
  • p. 80 …heavier and delivered only 10,200 pounds of thrust at sea level; the resulting --soarer UNCLASSIFIED
  • p. 89 …that they could not be flown at sea level faster than 190 knots in smooth air…
  • p. 98 …southern Europe and then across the Black Sea and the desert areas of China. These bal…
  • p. 102 …working on a cover story for over- seas operations. It was important to have a plausible…
  • p. 120 …neanteagon • 724744 (8009071 4-92 Finland Baltic Sea ükranian Italy ROME IUMIS Tunisia Mediterranean Sea UNCLASSIFIED
  • p. 139 …Soviet border from the Black Sea to the Caspian Sea and on to Afghanistan. The System…
  • p. 146 …aircraft made a run over the Black Sea. 'I here were a total of nine DB…
  • p. 148 …space launch taciitty east of the Aral Sea in Kazakhstan. None of the mission planners was…
  • p. 158 …it turned abruptly upward over the Bering Sea just west of Alaska, climbed to 110,000…
  • p. 166 …the Soviet border and over the Black Sea without entering Soviet airspace. In late August, as…
  • p. 215 …F"••• N. ' :\ ■ Caribbean Sea Ceyrnen Islands M FL) .r, Unttad ) ' ^ Gulf of Mexico NORTH ATLANTIC OCEAN…
  • p. 216 …Isle of P,floo Caribbean Sea ••• Corn. Islands IWO Janss — 200 kilometers 100 200 Miles ".! SgsgalgOidaRte…
  • p. 217 SAM Sites in Cuba, August 1962 Caribbean Sea Gulf of Mexico NORTH A TLANTIC OCEAN 9…
  • p. 316 …Shortly before Leningrad, the A-12 would head west-southwest down the Baltic Sea, skirting the…
-"gircr"11T141440,atj,
Chapter 2
71
005653421 UNCLASSIFIED
LeVier made an additional 19 flights in article 341 before mov-
ing on to other Lockheed flight test programs in early September.
This first phase of U-2 testing explored the craft's stall envelope, took
the aircraft to its maximum stress limit (2.5 g's), and explored its
speed potential. LeVier soon flew the aircraft at its maximum speed
of Mach 0.85. Flight tests continued, with the U-2 ascending to alti-
tudes never before attained in sustained flight. On 16 August LeVier
took the aircraft up to 52,000 feet. In preparation for this flight, the
42-year-old test pilot completed the Air Force partial-pressure suit
training program, becoming the oldest pilot to do so. Testing at even
higher altitudes continued, and on 8 September the U-2 reached its
initial design altitude of 65,600 feet.4'
On 22 September 1955, the U-2 experienced its first flameout at
64,000 feet—more than 12 miles up. After a brief restart, the .1571
P-37 engine again flamed out at 60,000 feet, and the aircraft
descended to 35,000 feet before the engine could be relit. Engineers
from Pratt & Whitney immediately set to work on this problem. The
P-37 model engine had significantly poorer combustion characteris-
tics than the preferred but unavailable P-31 version and therefore
tended to flame out at high altitudes. Combustion problems usually
became apparent as the U-2 began the final part of its climb from
57,000 to 65,000 feet, causing pilots to refer to this area as the "bad-
lands" or the "chimney." Flameouts bedeviled the U-2 project until
sufficient numbers of the more powerful P-31 engines became avail-
able in the spring of 1956.46
Meanwhile, with the airworthiness of the U-2 airframe proven,
Lockheed set up a production line in the Skunk Works, but delivery of
even the second-choice J57/P-37 engines became a major problem.
Pratt & Whitney's full production capacity for these engines for the
next year was contracted to the Air Force for use in F-100 fighters
and KC-135 tankers. Colonel Geary, with the help of a colleague in
the Air Force Materiel Command, managed to arrange the diversion
of a number of these engines from a shipment destined for Boeing's
KC-135 production line, making it possible to continue building the
U-2s.47
OSA Chronology, p. 7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14 (TS Cocleword).
Geary interview (S).
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.