Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 4 …Search for a New Reconnaissance Aircraft 8 Lockheed CL-282 Supporters and the CIA 13 Scientists…
  • p. 6 …260 Competition Between Lockheed and Convair 267 The Selection of the Lockheed Design 270 Efforts To…
  • p. 12 …excellent technical study of the U-2: Lockheed U-2 (1983). E0129581.131d111>10<25Yrs…
  • p. 21 …August 1953, OS1 records (S). " Jay Miller, Lockheed U-2, Aerograph 3 (Austin, Texas: Aerofax, 1983…
  • p. 22 …Immediately after returning to California, Carter proposed to Lockheed Vice President L. Eugene Root (previously the…
  • p. 23 …high-altitude reconnaissance aircraft Chapter 1 10 Lockheed also submit a design. Carter noted that the…
  • p. 24 …Miller, Lockheed U-2, p. 12. For more details on Kelly Johnson's original proposal. see…
  • p. 25 12 The Lockheed CL-282 CO5653421 UNCLASSIFIED Chapter 1 Development Planning. According to Wienberg, General LeMay…
  • p. 26 …Despite the Air Force's selection of the X-16, Lockheed continued to work on the…
  • p. 27 …six days before the Wright Air Development Command began to evaluate the Lockheed proposal. Gardner described…
  • p. 28 …range are not as good as the Lockheed CL-282. Gardner's enthusiasm for the CL…
  • p. 29 …Few details about Dulles's precise attitude toward the proposed Lockheed reconnaissance aircraft are available, but…
  • p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal still lacked official support…
  • p. 37 …ISP chairman Baker then urged Donovan to travel to southern California to evaluate the Lockheed design…
  • p. 39 …Thus, even though the Lockheed CL-282 had several important sources of support by September 1954…
  • p. 40 …Council.46 Project Three Support for the Lockheed CL-282 Even before the final Technological Capabilities…
  • p. 42 …Agency.49 Land learned the details of Lockheed's proposed CL-282 aircraft soon after he…
  • p. 43 …Chapter 1 30 briefly mention a Lockheed design for a high-flying aircraft at the 24…
  • p. 44 …During September and October the Project Three study group met frequently to discuss the Lockheed design…
  • p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the reach of…
  • p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar- gued that the Bell…
  • p. 49 …He used Gardner's statement to convince Lockheed's senior management to approve the project, which…
  • p. 50 …small group of prominent scientists that the Lockheed design represented the best possible overhead reconnais- sance…
  • p. 52 …afternoon of 3 December, they Although the Lockheed CL-282 was not designated as the U…
  • p. 53 …Eventually Bissell asked who was going to pay for the airframes to be built by Lockheed…
  • p. 55 …This category in- cluded maintenance personnel from Lockheed (five per aircraft), the pilots, and support personnel…
  • p. 57 …Then on 22 December 1954, the Agency signed a letter contract with Lockheed, using the codename…
  • p. 58 …The U-2 would have a The Lockheed "Skunk Works" was named after the Kickapoo Joy…
  • p. 59 …Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954, Lockheed Contract Files, OSA Records (S). UNCLASSIFIED
  • p. 61 …Reconnaissance Aircraft, Lockheed Aircraft Corporation Report 10420. 28 January 1955. pp. 7-9, OSA Recordsi \ (5…
  • p. 63 …1954, even before the CIA adopted the Lockheed proposal. Baker quickly recognized, however, that he would…
  • p. 69 …Miller, Lockheed U-2. pp. 19-20. Sè'biet UNCLASSIFIED
  • p. 74 …aircraft—remained the ex- clusive province of Lockheed:9 As a result of this agreement, CIA…
  • p. 77 …The first model of the pressure suit, used by Lockheed test pilots, made no provision for…
  • p. 79 …Geary told Culbertson that the Lockheed CL-282 was going to be known officially as the…
  • p. 81 …former director of Lockheed's Skunk Works, to Donald E. Welzenbach, 14 March 1986 (U): Miller…
  • p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22. OSA History, chap. 8, pp. 12-14…
  • p. 85 …how to transfer Lockheed employees from Burbank to Iwithout arousing a great deal of curiosity. The…
  • p. 88 …Colonel Yancey was in charge of six SAL pilots who were to be trained by Lockheed…
  • p. 90 …CIA, which then placed an order with Lockheed for 29 U-2s in configurations to be…
  • p. 107 …U-2 cover story stating that a Lockheed-developed aircraft would be flown by the USAF…
  • p. 143 …Lockheed mechanics had mounted the various RAINBOW devices on the prototype U-2, a Lockheed test…
  • p. 144 …Unable to restart the power plant, Lockheed test pilot Robert Sicker bailed out but was struck…
  • p. 145 …The loss of one of Lockheed's best test pilots, as well as the pro- totype…
  • p. 157 …As a substitute, Lockheed began working to develop a paint with radar-suppressant qualities, but this…
  • p. 162 …a series of tests over Edwards AFB. Lockheed began coating the 11-2s with a standard…
  • p. 188 …Although it haL refurbished by Lockheed and now had the more powerful 175 engine that would…
  • p. 200 …Beschloss claims that Powers was fired by Lockheed for criticizing the Agency in his memoirs (which…
  • p. 209 …Some poetic justice in this.' One week later Colonel Geary called to order Lockheed to up…
  • p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that they could be refueled in…
  • p. 220 …story, which was that its pilots were Lockheed employees on a ferry flight to Puerto Rico…
  • p. 230 …CO5653421 UNCLASSIFIED Chapter 5 Late in 1958, Lockheed began refitting the Agency's 13 remaining U…
  • p. 264 …1966 decided to place an order with Lockheed for ei g ht more aircraft to be…
  • p. 265 …Francis Gary Powers was one of the Lockheed test pilots who checked out this new aircraft…
  • p. 266 …began coming off the production line at Lockheed in-the autumn of 1968, CIA and the…
  • p. 273 …SP-1362, "History of the OXCART Program," Lockheed Aircraft Corporation, Burbank, CA. 1 July 1968, p…
  • p. 275 …Personnel at Lockheed's Skunk Works referred to these aircraft concepts as "Archangel-1," "Archangel-2…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 280 …During the first half of 1959, both Lockheed and Convair worked to reduce the radar cross…
  • p. 281 …In early June, Lockheed submitted a design for a ground-launched aircraft known as the A…
-"gircr"11T141440,atj,
Chapter 2
71
005653421 UNCLASSIFIED
LeVier made an additional 19 flights in article 341 before mov-
ing on to other Lockheed flight test programs in early September.
This first phase of U-2 testing explored the craft's stall envelope, took
the aircraft to its maximum stress limit (2.5 g's), and explored its
speed potential. LeVier soon flew the aircraft at its maximum speed
of Mach 0.85. Flight tests continued, with the U-2 ascending to alti-
tudes never before attained in sustained flight. On 16 August LeVier
took the aircraft up to 52,000 feet. In preparation for this flight, the
42-year-old test pilot completed the Air Force partial-pressure suit
training program, becoming the oldest pilot to do so. Testing at even
higher altitudes continued, and on 8 September the U-2 reached its
initial design altitude of 65,600 feet.4'
On 22 September 1955, the U-2 experienced its first flameout at
64,000 feet—more than 12 miles up. After a brief restart, the .1571
P-37 engine again flamed out at 60,000 feet, and the aircraft
descended to 35,000 feet before the engine could be relit. Engineers
from Pratt & Whitney immediately set to work on this problem. The
P-37 model engine had significantly poorer combustion characteris-
tics than the preferred but unavailable P-31 version and therefore
tended to flame out at high altitudes. Combustion problems usually
became apparent as the U-2 began the final part of its climb from
57,000 to 65,000 feet, causing pilots to refer to this area as the "bad-
lands" or the "chimney." Flameouts bedeviled the U-2 project until
sufficient numbers of the more powerful P-31 engines became avail-
able in the spring of 1956.46
Meanwhile, with the airworthiness of the U-2 airframe proven,
Lockheed set up a production line in the Skunk Works, but delivery of
even the second-choice J57/P-37 engines became a major problem.
Pratt & Whitney's full production capacity for these engines for the
next year was contracted to the Air Force for use in F-100 fighters
and KC-135 tankers. Colonel Geary, with the help of a colleague in
the Air Force Materiel Command, managed to arrange the diversion
of a number of these engines from a shipment destined for Boeing's
KC-135 production line, making it possible to continue building the
U-2s.47
OSA Chronology, p. 7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14 (TS Cocleword).
Geary interview (S).
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.