Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 4 …Scientists and Overhead Reconnaissance 17 The BEACON HILL Report 17 Concern About the Danger of a…
  • p. 14 …view of the "other side of the hill." With the advent of dry film, it became…
  • p. 30 …of this new advisory body." The BEACON HILL Report In 1951 the Air Force sought even…
  • p. 31 …Their head- quarters was located over a secretarial school on Beacon Hill, which soon became the…
  • p. 32 …to implement the ideas of the BEACON HILL Report until the summer of 1953. By this…
  • p. 34 …Created in July 1953, the Intelligence Systems Panel (ISP) included several experts from the BEACON HILL…
  • p. 37 …reconnais- sance needs expressed in the BEACON HILL Report. Theoretically, he explained to the panel, any…
  • p. 41 …H. T. Friis R. Mettler A. G. Hill E. Purcell W. H. Radford E. H. Plesset…
  • p. 44 …6(dli1i>10<25Yrs since the BEACON HILL and Intelligence Systems Panel meetings. (Si James Baker…
  • p. 45 …Having participated in the BEACON HILL Study and the Intelligence Systems Panel, several Project Three members…
  • p. 344 …He headed the Beacon Hill Panel in 1952 and later became director of Lincoln Laboratories. PARANGOSKY…
  • p. 345 …of several advisory panels, including the BEACON HILL project. He helped Baker decide what cameras to…
  • p. 364 …BEACON HILL Report: Problems of Air Force Intelligence and Reconnaissance. Massachusetts Institute of Technology, 15 June…
-"gircr"11T141440,atj,
Chapter 2
71
005653421 UNCLASSIFIED
LeVier made an additional 19 flights in article 341 before mov-
ing on to other Lockheed flight test programs in early September.
This first phase of U-2 testing explored the craft's stall envelope, took
the aircraft to its maximum stress limit (2.5 g's), and explored its
speed potential. LeVier soon flew the aircraft at its maximum speed
of Mach 0.85. Flight tests continued, with the U-2 ascending to alti-
tudes never before attained in sustained flight. On 16 August LeVier
took the aircraft up to 52,000 feet. In preparation for this flight, the
42-year-old test pilot completed the Air Force partial-pressure suit
training program, becoming the oldest pilot to do so. Testing at even
higher altitudes continued, and on 8 September the U-2 reached its
initial design altitude of 65,600 feet.4'
On 22 September 1955, the U-2 experienced its first flameout at
64,000 feet—more than 12 miles up. After a brief restart, the .1571
P-37 engine again flamed out at 60,000 feet, and the aircraft
descended to 35,000 feet before the engine could be relit. Engineers
from Pratt & Whitney immediately set to work on this problem. The
P-37 model engine had significantly poorer combustion characteris-
tics than the preferred but unavailable P-31 version and therefore
tended to flame out at high altitudes. Combustion problems usually
became apparent as the U-2 began the final part of its climb from
57,000 to 65,000 feet, causing pilots to refer to this area as the "bad-
lands" or the "chimney." Flameouts bedeviled the U-2 project until
sufficient numbers of the more powerful P-31 engines became avail-
able in the spring of 1956.46
Meanwhile, with the airworthiness of the U-2 airframe proven,
Lockheed set up a production line in the Skunk Works, but delivery of
even the second-choice J57/P-37 engines became a major problem.
Pratt & Whitney's full production capacity for these engines for the
next year was contracted to the Air Force for use in F-100 fighters
and KC-135 tankers. Colonel Geary, with the help of a colleague in
the Air Force Materiel Command, managed to arrange the diversion
of a number of these engines from a shipment destined for Boeing's
KC-135 production line, making it possible to continue building the
U-2s.47
OSA Chronology, p. 7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14 (TS Cocleword).
Geary interview (S).
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.