Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
CO5653421 UNCLASSIFIED
--g-e171111149/41/41,
Chapter 2
68
power-to-weight ratio of 2.7: I was almost 20 percent less efficient
than the preferred P-31 version.'
To conduct lengthy missions over hostile territory, the U-2
needed to carry a large amount of fuel. Kelly Johnson used a
"wet-wing" design for the U-2, which meant that fuel was not stored
in separate fuel tanks but rather in the wing itself. Each wing was di-
vided into two leak-proof compartments, and fuel was pumped into
all the cavities within these areas; only the outer 6 feet of the wings
were not used for fuel storage. The U-2 also had a 100-gallon reserve
tank in its nose. Later, in 1957, Johnson increased the fuel capacity of
the U-2 by adding 100-gallon -slipper" tanks under each wing, pro-
jecting slightly ahead of the leading edge.
One of the most important considerations in the U-2's fuel sys-
tem was the need to maintain aircraft trim as the fuel was consumed.
The aircraft therefore contained a complex system of feed lines and
valves draining to a central sump, which made it impossible to pro-
vide the pilot with an empty/full type of fuel gauge. None of the first
50 U-2s had normal fuel gauges. Instead there were mechanical fuel
totalizer/counters. Before the start of a mission, the ground crew set
the counters to indicate the total amount of fuel in the wings. and then
a flow meter subtracted the gallons of fuel actually consumed during
the flight. The pilot kept a log of the fuel consumption shown by the
counters and compared it with estimates made by mission planners
for each leg of the flight. As a double check, U-2 pilots also kept
track of their fuel consumption by monitoring airspeed and time in
the air. Most pilots became quite expert at this. Several who did not
came up short of their home base during the 20 years these planes
were flown.4'
INITIAL TESTING OF THE U-2
Preliminary taxi trials began on 27 July 1955, when the first run down
the newly completed runway took the plane to 50 knots. Lockheed's
chief test pilot, Tony LeVier, was at the controls. A second taxi trial
OSA Hiswry, chap. 8. p. 13 (TS Codewort).
Information supplied by Norman Nelson. former director of Lockheed's Skunk Works,
to Donald E. Welzenbach, 14 March 1986 (U): Miller. Lockheed U-2. pp. 77, 96.
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.