Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
Secre FORN
Chapter 2
61
44"
AP-
Osmund J. Ritland
CO5653421 UNCLASSIFIED
project—the construction and testing of the aircraft—remained the ex-
clusive province of Lockheed:9
As a result of this agreement, CIA remained in control of the
program, but the Air Force played a very important role as well. As
Richard Bissell later remarked about the U-2 project, "The Air Force
wasn't just in on this as a supporting element, and to a major degree it
wasn't in on it just supplying about half the government personnel;
but the Air Force held, if you want to be precise, 49 percent of the
common stock." 3°
One of the first Air Force officers assigned to Project OILSTONE
was Col. Osmund J. Ritland. He began coordinating Air Force activi-
ties in the U-2 program with Richard Bissell in December 1954. On 27
June 1955, Ritland became Bissell's deputy, although Air Force Chief
of Staff Twining did not officially approve this assignment until 4
August, the day after the signing of the CIA–Air Force agreement. In
March 1956, Colonel Ritland returned to the Air Force and was fol-
lowed as deputy project director by Col. Jack A. Gibbs.
- - Another Air Force officer, Lt. Col. Leo P. Geary, joined the pro-
gram in June 1955 and remained with it until August 1966, longer
than any of the other project managers. Using the Air Force
Inspector General's office as cover with the title of Project Officer,
AFCIG-5, Geary served as the focal point for all Defense
Department support to the U-2 and OXCART programs. His II years
with the overhead reconnaissance projects provided a high degree of
Air Force continuity!'
TECHNICAL CHALLENGES TO
HIGH-ALTITUDE FLIGHT
To get the U-2 aircraft ready to fly, Lockheed engineers had to solve
problems never before encountered. Among these problems was the
need for a fuel that would not boil off and evaporate at the very high
altitudes for which the aircraft was designed. Gen. James H. Doolittle
OSA History, chap. 3, p. 15 and annex 14 (TS Codeword).
Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword).
" Brig. Gen. Leo A. Geary (USAF-Ret.), interview by Donald E. Welzenbach, tape re-
cording, 3 April 1986 (S); OSA History, chap. 3, p. 3 (TS Codeword).
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.