Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design."' Another factor in the rejection of Kelly Johnson's…
  • p. 26 …interview by Donald E. Welzenbach, Corona del Mar. California. 20 May 1985 (S). Johnson, "Log for…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson's revolutionary design a reality, one additional source of support was necessary…
  • p. 42 …When James Killian asked Land to head Project Three, Land had to make a major decision…
  • p. 48 …do the job in Johnson's airplane. And further, 1 overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …a week after he had been authorized to begin the project, Kelly Johnson wrote a 23…
  • p. 69 …project staff) flew LIZ with Kelly Johnson in a small Beechcraft plane piloted by eed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Batlin suggested the method used by Nazi war criminal Hermann Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a "wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
CO5653421 UNCLASSIFIED
Sec NOFORN
Cha 6
299
Although overflights of the Soviet Union appeared to be out of
the question, the OXCART's eventual employment elsewhere in the
world remained a strong possibility, particularly after the Cuban
Missile Crisis of October 1962 demonstrated the continuing need for
manned strategic reconnaissance aircraft. Since satellites had not been
able to supply the kinds of coverage needed, U-2s had carried out nu-
merous overflights of Cuba. Nevertheless, the U-2 remained vulnera-
ble to surface-to-air missiles (as had once again been demonstrated by
the downing of a SAC U-2 during the Missile Crisis), and project
headquarters had even briefly considered sending the A-12 over Cuba
in October 1962, even though the aircraft still lacked the required J58
engines and would have had to use much less powerful ones." After
the Missile Crisis ended, Air Force U-2s continued to photograph
Cuba under a tacit superpower understanding that such monitoring of
the withdrawal of the missiles would proceed without interference.
But the possibility of future Soviet or Cuban action against the U-2s
remained, raising the dismaying prospect that the United States would
not be able to tell if the Soviet Union was reintroducing ballistic mis-
siles into Cuba.
-- Such fears became acute in the summer of 1964 after Soviet
Premier Nikita Khrushchev told foreign visitors such as columnist
Drew Pearson, former Senator William Benton, and Danish Prime
Minister Jens Otto Krag that, once the US elections had been held in
November, U-2s flying over Cuba would be shot down. Project head-
quarters therefore began preparing contingency plans (Project
SKYLARK) for the possible employment of OXCART over Cuba,
even though the new aircraft was not yet ready for operations. On 5
August 1964, the Acting DC1, Gen. Marshall S. Carter, ordered the
project staff to achieve emergency operational readiness of the
OXCART by 5 November 1964, in case Premier Khrushchev actually
carried out his threat to shoot down U-2s.52
To meet this deadline, the Office of Special Activities organized
a detachment of five pilots and ground crews to conduct flights to val-
idate camera performance and qualify pilots for Mach 2.8 operations.
Simulating Cuban missions during training flights, the detachment
" On 23 October 1962 Johnson noted in his "Archangel log": that the performance of an
A-12 with 175 engines (as suggested by project headquarters for possible use over Cuba)
would be "hardly spectacular.-
" Johnson, "Archangel log," 17 August 1964 'OXCART Story." p. 19 (Si:
USA History, chap. 20, p. 81 (TS Codeword)
UNCLASSIFIED
E0129581.131d1(11>10<25Yrs
(SI

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.