This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to alti- tudes never before attained in sustained…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover re…
  • p. 138 …Then in January 1960, the commander of Detachment B, raised an important question that had never…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its orig- inal U-2s with the J75 engines." Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on I May 1960 proved to be the…
  • p. 223 …Responsibility for photo- graphic coverage of Cuba remained with the Air Force; Agency pilots never flew…
  • p. 264 Sratrt.11/Qt2.1....31■1 Chapter 5 251 005653421 UNCLASSIFIED There was never another Agency…
  • p. 290 …the OXCART aircraft for its own use. never adopted the laminated vertical stabilizers.'4 THE OXCART…
  • p. 294 …Scott employed concepts never be- fore used in camera systems. These included the use of a…
  • p. 298 …As it turned out, the J58 was never used in a Navy aircraft. OSA History. chap…
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and locktin modes, a fact that…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …its speed and altitude have never been equaled. The development of this aircraft also led to…
- Ibid., pp. 80-81 (TS Codeword 'OXCART Story," pp. 17-18
47 OSA History, chap. 20, p. 94 (TS Codeword).
CO5653421 UNCLASSIFIED
Chapter 6
296
(0 12950
(S1
Two more A-12s were lost in later testing. On 9 July 1964, arti-
cle 133 crashed while landing when a pitch-control servo device
froze, rolling the plane into a wing-down position. Ejecting from an
altitude of 120 feet, the pilot was blown sideways out of the craft.
Although he was not very high off the ground, his parachute did open
and he landed during the parachute's first swing. Fortunately he was
unhurt, and no news of the accident filtered out of the base. Eighteen
months later, on 28 December 1965, article 126 crashed immediately
after takeoff because of an improperly wired stability augmentation
system. As in the previous crash, the pilot ejected safely. and there
was no publicity connected with the crash. An investigation ordered
by DCI McCone determined that the wiring error had resulted from
negligence, not sabotage."
The A-12 made its first long-range, high-speed flight on 27
January 1965. The tlight lasted 100 minutes. 75 minutes of which
were flown at speeds greater than Mach 3.1, and the aircraft covered
2.580 miles at altitudes between 75,600 and 80,000 feet. By this time.
the OXCART was performing well. The engine inlet, camera, hydrau-
lic, navigation, and fli g ht-control systems all demonstrated acceptable
reliability.
Nevertheless, as the OXCART began flying longer, faster, and
higher, new problems arose. The most serious of these problems in-
volved the aircraft's wiring. Continuing malfunctions of the inlet con-
trols, communications equipment, ECM systems, and cockpit
instruments were often attributable to wiring failures. Wiring connec-
tors and components had to withstand temperatures above 800'F,
structural flexing, vibration, and shock. Such demands were more
than the materials could stand. Not all of the OXCART's problems
could be traced to materiel failures, however, and Agency officials
believed that careless maintenance by Lockheed employees also con-
tributed to malfunctions.'"
Concerned that Lockheed would not be able to meet the
OXCART's schedule for operational readiness, the Office of Special
Activities' Director of Technology, John Paran gosky, met with Kelly
Johnson on 3 August 1965 to discuss the project's problems. Johnson
not only assigned more top-level supervisors to the project but also
UNCLASSIFIED