This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 4 …Scientists and Overhead Reconnaissance 17 The BEACON HILL Report 17 Concern About the Danger of a…
  • p. 14 …view of the "other side of the hill." With the advent of dry film, it became…
  • p. 30 …of this new advisory body." The BEACON HILL Report In 1951 the Air Force sought even…
  • p. 31 …Their head- quarters was located over a secretarial school on Beacon Hill, which soon became the…
  • p. 32 …to implement the ideas of the BEACON HILL Report until the summer of 1953. By this…
  • p. 34 …Created in July 1953, the Intelligence Systems Panel (ISP) included several experts from the BEACON HILL…
  • p. 37 …reconnais- sance needs expressed in the BEACON HILL Report. Theoretically, he explained to the panel, any…
  • p. 41 …H. T. Friis R. Mettler A. G. Hill E. Purcell W. H. Radford E. H. Plesset…
  • p. 44 …6(dli1i>10<25Yrs since the BEACON HILL and Intelligence Systems Panel meetings. (Si James Baker…
  • p. 45 …Having participated in the BEACON HILL Study and the Intelligence Systems Panel, several Project Three members…
  • p. 344 …He headed the Beacon Hill Panel in 1952 and later became director of Lincoln Laboratories. PARANGOSKY…
  • p. 345 …of several advisory panels, including the BEACON HILL project. He helped Baker decide what cameras to…
  • p. 364 …BEACON HILL Report: Problems of Air Force Intelligence and Reconnaissance. Massachusetts Institute of Technology, 15 June…
- Ibid., pp. 80-81 (TS Codeword 'OXCART Story," pp. 17-18
47 OSA History, chap. 20, p. 94 (TS Codeword).
CO5653421 UNCLASSIFIED
Chapter 6
296
(0 12950
(S1
Two more A-12s were lost in later testing. On 9 July 1964, arti-
cle 133 crashed while landing when a pitch-control servo device
froze, rolling the plane into a wing-down position. Ejecting from an
altitude of 120 feet, the pilot was blown sideways out of the craft.
Although he was not very high off the ground, his parachute did open
and he landed during the parachute's first swing. Fortunately he was
unhurt, and no news of the accident filtered out of the base. Eighteen
months later, on 28 December 1965, article 126 crashed immediately
after takeoff because of an improperly wired stability augmentation
system. As in the previous crash, the pilot ejected safely. and there
was no publicity connected with the crash. An investigation ordered
by DCI McCone determined that the wiring error had resulted from
negligence, not sabotage."
The A-12 made its first long-range, high-speed flight on 27
January 1965. The tlight lasted 100 minutes. 75 minutes of which
were flown at speeds greater than Mach 3.1, and the aircraft covered
2.580 miles at altitudes between 75,600 and 80,000 feet. By this time.
the OXCART was performing well. The engine inlet, camera, hydrau-
lic, navigation, and fli g ht-control systems all demonstrated acceptable
reliability.
Nevertheless, as the OXCART began flying longer, faster, and
higher, new problems arose. The most serious of these problems in-
volved the aircraft's wiring. Continuing malfunctions of the inlet con-
trols, communications equipment, ECM systems, and cockpit
instruments were often attributable to wiring failures. Wiring connec-
tors and components had to withstand temperatures above 800'F,
structural flexing, vibration, and shock. Such demands were more
than the materials could stand. Not all of the OXCART's problems
could be traced to materiel failures, however, and Agency officials
believed that careless maintenance by Lockheed employees also con-
tributed to malfunctions.'"
Concerned that Lockheed would not be able to meet the
OXCART's schedule for operational readiness, the Office of Special
Activities' Director of Technology, John Paran gosky, met with Kelly
Johnson on 3 August 1965 to discuss the project's problems. Johnson
not only assigned more top-level supervisors to the project but also
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.