Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 12 …later, at press conferences in February and July 1964, President Lyndon B. Johnson revealed the existence…
  • p. 40 …MIT Press. 1977), p. 68: Beschloss, Maplay, p. 74: TCP Report. pp. 185-186 (S). UNCLASSIFIED
  • p. 98 …The Soviet Union sent strongly worded protest notes to the United States and the nations from…
  • p. 102 …not only press releases and the public line to be taken, but also the suspension of…
  • p. 107 …The "provisional" designation gave the U-2 detachments greater security because provisional Air Force units did…
  • p. 112 …at a press conference that the Soviet Union might be ahead of the United States in…
  • p. 125 …Dial Press, 1982), pp. 45-47. Lundahl and Brugioni interview (TS Codeword). UNCLASSIFIED
  • p. 174 …McElroy stressed that the gap would be temporary and that at its end the United States…
  • p. 195 …in the press about the presence of "spyplanes" on Japanese territory, asked the United States to…
  • p. 198 …DCI records (S). " United States Congress, Senate. Foreign Relations Committee, Executive Sessions of the Senate Foreign…
  • p. 307 …By 1962 the United States had become aware of the effectiveness of a new Soviet radar…
  • p. 315 …To preserve the secrecy of the OXCART program, the Air Force informed the press that an…
  • p. 328 …at times when the press and Congress alleged that the United States was falling behind the…
  • p. 362 …MIT Press, 1977. Kistiakowsky. George B. A Scientist at the White House. Cambridge: Harvard University Press…
—aagarAti-Peerorkr-
Chapter 6
286
ED 129581.6M11>101045Yrs
1S1
DELIVERY OF THE FIRST OXCART
The first A- 12, known as article 121, was assembled and tested at
Burbank during January and February 1962. Since it could not be
flown to the site, the aircraft had to be partially disassembled
and put on a specially designed trailer that cost nearly S100,000. The
entire fuselage, without the wings, was crated and covered, creating a
load 35 feet wide and 105 feet long. To transport this huge load safely
over the hundreds of miles to the site, obstructing road signs were re-
moved, trees were trimmed, and some roadbanks had to be leveled.
The plane left Burbank on 26 February 1962 and arrived at
two days later.
After the fuselage arrived in Nevada. its wings were attached and
the J75 engines were installed, but the aircraft was still not ready to be
tested. This new delay was caused by leaking fuel tanks, a problem
that would never be solved completely. Because the A-12's high
speeds heat the titanium airframe to more than 500°F. Lockheed
designers had to make allowances for expansion. When the metal was
cold, the expansion joints were at their widest. In the fuel tanks, these
zaps were tilled by pliable sealants. but the fuel for the A-12's engines
acted as a strong reducin g agent that softened the sealants. causing
leaks. Thus, when fuel was first poured into the aircraft, 68 leaks
developed. Lockheed technicians then stripped and replaced all the
sealant, a tedious and time consuming procedure because the sealant
required four curing cycles, each at a different temperature over a
period of 30 to 54 hours. The engineers were never able to discover a
sealant compound that was completely impervious to the jet fuel while
remainin g elastic enough to expand and contract sufficiently. The
A-12's tanks continued to leak, so when it was fueled, it only received
enough fuel to get airborne. The plane would then rendezvous with a
tanker, top off its tanks. and immediately climb to operating altitude,
causing the metal to expand and the leaks to stop.'"
CHANGES IN THE PROJECT MANAGEMENT
Richard Bissell, whose concern for the viability of the U-2 in 1956
had led to the establishment of Project OXCART and who had di-
rected its growth all along, was no longer in charge when the first
OSA History, chap. 20. p. 62 ITS Codewort0;" "OXCART Story." p I I (S)
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.