“Lockheed”60+ pages
- p. 4 …Search for a New Reconnaissance Aircraft 8
Lockheed CL-282 Supporters and the CIA 13
Scientists…
- p. 6 …260
Competition Between Lockheed and Convair 267
The Selection of the Lockheed Design 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2
(1983).
E0129581.131d111>10<25Yrs…
- p. 21 …August 1953, OS1 records (S).
" Jay Miller, Lockheed U-2, Aerograph 3 (Austin, Texas: Aerofax, 1983…
- p. 22 …Immediately after returning to California, Carter proposed to
Lockheed Vice President L. Eugene Root (previously the…
- p. 23 …high-altitude
reconnaissance aircraft
Chapter 1
10
Lockheed also submit a design. Carter noted that the…
- p. 24 …Miller, Lockheed U-2, p. 12. For more details on Kelly Johnson's original proposal.
see…
- p. 25 12
The Lockheed CL-282
CO5653421 UNCLASSIFIED
Chapter 1
Development Planning. According to Wienberg, General LeMay…
- p. 26 …Despite the Air Force's selection
of the X-16, Lockheed continued to work on the…
- p. 27 …six days before the Wright Air Development Command
began to evaluate the Lockheed proposal. Gardner described…
- p. 28 …range are not as good as the
Lockheed CL-282.
Gardner's enthusiasm for the CL…
- p. 29 …Few details about Dulles's precise attitude
toward the proposed Lockheed reconnaissance aircraft are available,
but…
- p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal
still lacked official support…
- p. 37 …ISP chairman Baker then urged Donovan to travel to
southern California to evaluate the Lockheed design…
- p. 39 …Thus, even though
the Lockheed CL-282 had several important sources of support by
September 1954…
- p. 40 …Council.46
Project Three Support for the Lockheed CL-282
Even before the final Technological Capabilities…
- p. 42 …Agency.49
Land learned the details of Lockheed's proposed CL-282 aircraft
soon after he…
- p. 43 …Chapter 1
30
briefly mention a Lockheed design for a high-flying aircraft at the
24…
- p. 44 …During September and October the Project Three study group
met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the
reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar-
gued that the Bell…
- p. 49 …He used Gardner's
statement to convince Lockheed's senior management to approve the
project, which…
- p. 50 …small group of prominent scientists that the
Lockheed design represented the best possible overhead reconnais-
sance…
- p. 52 …afternoon of 3 December, they
Although the Lockheed CL-282 was not designated as the U…
- p. 53 …Eventually Bissell asked who was
going to pay for the airframes to be built by Lockheed…
- p. 55 …This category in-
cluded maintenance personnel from Lockheed (five per
aircraft), the pilots, and support personnel…
- p. 57 …Then on 22 December 1954, the Agency
signed a letter contract with Lockheed, using the codename…
- p. 58 …The U-2 would have a
The Lockheed "Skunk Works" was named after the Kickapoo Joy…
- p. 59 …Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954,
Lockheed Contract Files, OSA Records (S).
UNCLASSIFIED
- p. 61 …Reconnaissance Aircraft, Lockheed Aircraft Corporation Report 10420. 28 January 1955.
pp. 7-9, OSA Recordsi \ (5…
- p. 63 …1954, even before the CIA adopted
the Lockheed proposal. Baker quickly recognized, however, that he
would…
- p. 69 …Miller, Lockheed U-2. pp. 19-20.
Sè'biet
UNCLASSIFIED
- p. 74 …aircraft—remained the ex-
clusive province of Lockheed:9
As a result of this agreement, CIA…
- p. 77 …The first model of the
pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed
CL-282 was going to be known officially as the…
- p. 81 …former director of Lockheed's Skunk Works,
to Donald E. Welzenbach, 14 March 1986 (U): Miller…
- p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14…
- p. 85 …how to transfer Lockheed employees
from Burbank to Iwithout arousing a great deal of curiosity.
The…
- p. 88 …Colonel Yancey was in charge of six SAL pilots who were to be
trained by Lockheed…
- p. 90 …CIA, which then placed an order with
Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2
cover story stating that a Lockheed-developed aircraft would be flown
by the USAF…
- p. 143 …Lockheed mechanics
had mounted the various RAINBOW devices on the prototype U-2, a
Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed test pilot
Robert Sicker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots, as well as the pro-
totype…
- p. 157 …As a substitute,
Lockheed began working to develop a paint with radar-suppressant
qualities, but this…
- p. 162 …a series of tests over Edwards AFB. Lockheed began coating
the 11-2s with a standard…
- p. 188 …Although it haL refurbished by
Lockheed and now had the more powerful 175 engine that would…
- p. 200 …Beschloss claims that Powers was fired by Lockheed
for criticizing the Agency in his memoirs (which…
- p. 209 …Some poetic justice in this.'
One week later Colonel Geary called to order Lockheed to up…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that
they could be refueled in…
- p. 220 …story, which
was that its pilots were Lockheed employees on a ferry flight to
Puerto Rico…
- p. 230 …CO5653421 UNCLASSIFIED
Chapter 5
Late in 1958, Lockheed began refitting the Agency's 13 remaining
U…
- p. 264 …1966 decided to place an order with Lockheed for ei g ht more aircraft
to be…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who
checked out this new aircraft…
- p. 266 …began coming off the production line at Lockheed
in-the autumn of 1968, CIA and the…
- p. 273 …SP-1362, "History of the OXCART Program,"
Lockheed Aircraft Corporation, Burbank, CA. 1 July 1968, p…
- p. 275 …Personnel at Lockheed's Skunk Works referred to
these aircraft concepts as "Archangel-1," "Archangel-2…
- p. 276 RN
Chapter 6
263
Johnson, "Archangel log," 17-24
CO5653421 UNCLASSIFIED
Lockheed design for a hydrogen…
- p. 280 …During the first half of 1959, both Lockheed and Convair
worked to reduce the radar cross…
- p. 281 …In early June, Lockheed submitted a design for a ground-launched
aircraft known as the A…
—aagarAti-Peerorkr-
Chapter 6
286
ED 129581.6M11>101045Yrs
1S1
DELIVERY OF THE FIRST OXCART
The first A- 12, known as article 121, was assembled and tested at
Burbank during January and February 1962. Since it could not be
flown to the site, the aircraft had to be partially disassembled
and put on a specially designed trailer that cost nearly S100,000. The
entire fuselage, without the wings, was crated and covered, creating a
load 35 feet wide and 105 feet long. To transport this huge load safely
over the hundreds of miles to the site, obstructing road signs were re-
moved, trees were trimmed, and some roadbanks had to be leveled.
The plane left Burbank on 26 February 1962 and arrived at
two days later.
After the fuselage arrived in Nevada. its wings were attached and
the J75 engines were installed, but the aircraft was still not ready to be
tested. This new delay was caused by leaking fuel tanks, a problem
that would never be solved completely. Because the A-12's high
speeds heat the titanium airframe to more than 500°F. Lockheed
designers had to make allowances for expansion. When the metal was
cold, the expansion joints were at their widest. In the fuel tanks, these
zaps were tilled by pliable sealants. but the fuel for the A-12's engines
acted as a strong reducin g agent that softened the sealants. causing
leaks. Thus, when fuel was first poured into the aircraft, 68 leaks
developed. Lockheed technicians then stripped and replaced all the
sealant, a tedious and time consuming procedure because the sealant
required four curing cycles, each at a different temperature over a
period of 30 to 54 hours. The engineers were never able to discover a
sealant compound that was completely impervious to the jet fuel while
remainin g elastic enough to expand and contract sufficiently. The
A-12's tanks continued to leak, so when it was fueled, it only received
enough fuel to get airborne. The plane would then rendezvous with a
tanker, top off its tanks. and immediately climb to operating altitude,
causing the metal to expand and the leaks to stop.'"
CHANGES IN THE PROJECT MANAGEMENT
Richard Bissell, whose concern for the viability of the U-2 in 1956
had led to the establishment of Project OXCART and who had di-
rected its growth all along, was no longer in charge when the first
OSA History, chap. 20. p. 62 ITS Codewort0;" "OXCART Story." p I I (S)
UNCLASSIFIED