CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
—aagarAti-Peerorkr-
Chapter 6
286
ED 129581.6M11>101045Yrs
1S1
DELIVERY OF THE FIRST OXCART
The first A- 12, known as article 121, was assembled and tested at
Burbank during January and February 1962. Since it could not be
flown to the site, the aircraft had to be partially disassembled
and put on a specially designed trailer that cost nearly S100,000. The
entire fuselage, without the wings, was crated and covered, creating a
load 35 feet wide and 105 feet long. To transport this huge load safely
over the hundreds of miles to the site, obstructing road signs were re-
moved, trees were trimmed, and some roadbanks had to be leveled.
The plane left Burbank on 26 February 1962 and arrived at
two days later.
After the fuselage arrived in Nevada. its wings were attached and
the J75 engines were installed, but the aircraft was still not ready to be
tested. This new delay was caused by leaking fuel tanks, a problem
that would never be solved completely. Because the A-12's high
speeds heat the titanium airframe to more than 500°F. Lockheed
designers had to make allowances for expansion. When the metal was
cold, the expansion joints were at their widest. In the fuel tanks, these
zaps were tilled by pliable sealants. but the fuel for the A-12's engines
acted as a strong reducin g agent that softened the sealants. causing
leaks. Thus, when fuel was first poured into the aircraft, 68 leaks
developed. Lockheed technicians then stripped and replaced all the
sealant, a tedious and time consuming procedure because the sealant
required four curing cycles, each at a different temperature over a
period of 30 to 54 hours. The engineers were never able to discover a
sealant compound that was completely impervious to the jet fuel while
remainin g elastic enough to expand and contract sufficiently. The
A-12's tanks continued to leak, so when it was fueled, it only received
enough fuel to get airborne. The plane would then rendezvous with a
tanker, top off its tanks. and immediately climb to operating altitude,
causing the metal to expand and the leaks to stop.'"
CHANGES IN THE PROJECT MANAGEMENT
Richard Bissell, whose concern for the viability of the U-2 in 1956
had led to the establishment of Project OXCART and who had di-
rected its growth all along, was no longer in charge when the first
OSA History, chap. 20. p. 62 ITS Codewort0;" "OXCART Story." p I I (S)
UNCLASSIFIED