Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
  • p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
  • p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
  • p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
  • p. 96 …All of the products from this project would be placed in the new control sys- tem…
  • p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
  • p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
  • p. 128 …the following day, whithi next U-2 mission returned from the Middle East. After quickly developing…
  • p. 140 …Welzenbach (S); Mission folder 4020 (18 Marcn n, CJJA rerar9 ITS Codeword). OSA History. chap. 4…
  • p. 142 …of the first series of U-2 missions as condu this research under a project codenamed…
  • p. 147 …not an easy task in crowded Japan.`) Detachment C began conducting missions in June 1957 after…
  • p. 191 …This revised cover story, along with a mission flight plan consistent with it, was sent to…
  • p. 196 …with Abel's "wife" (probably his Soviet control) in East Germany. In November 1961, Acting DCI…
  • p. 204 …in-the DDP in order to maintain control of his overhead reconnais- sance projects (the U…
  • p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba. the DOD representatives called…
  • p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
  • p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
SecrefTSQRN
Chapter 6
285
005653421 UNCLASSIFIED
to reduce expenditures. After much refiguring, project officials de-
cided to decrease the number of deliverable aircraft. Amendment No.
11 to the contract reduced from 12 to 10 the number of A- 12s, for a
total cost of $161.2 million:7
The cancellation of these two A- 12s was offset by an Air Force
order for the development of a supersonic interceptor variant of the
A-12 to serve as a replacement for the North American F- 108A Rapier
interceptor project, which had been canceled in late 1960. With the
assistance of the the Air Force
entered into an agreement with Lockneed to proauce uiree AF-12 air-
craft, based on the A-12 design but modified to carry a second crew-
man and three air-to-air missiles. This effort was called Project
KEDLOCK. The AF-12 (later redesignated the YF-12A) was de-
signed to intercept enemy bombers long before they reached the
United States, and initial Air Force plans envisioned a force of up to
100 of these supersonic interceptors. In fact, only three of these planes
were built and delivered during the 1963-64 time frame because
Secretary of Defense McNamara canceled the program as a cost-cut-
ting measure. The Air Force bore all of the costs of the YF-I2A pro-
ject.; CIA was only involved in helping to write -black" contracts.4
Lockheed was not the only OXCART contractor having trouble
containing costs: Pratt & Whitney was fighting an even bigger battle.
In mid-I961, Pratt & Whitney overruns threatened to halt the entire
OXCART project. At the suggestion of Cdr. William Holcomb in the
office of the Chief of Naval Materiel, Richard Bissell asked the Navy
to assist in funding the 158's development. After hearing Bissell and
Holcomb's suggestion that the J58 might be used in future Navy air-
craft, VAdm. William A. Schoech, Chief of the Navy Materiel
Command that had originally financed the J58 engine, authorized the
transfer of $38 million in end-of-year funds to the project, thus keep-
ing the OXCART's head above water."9 As it turned out, the J58 was
never used in a Navy aircraft.
OSA History. chap. 20. pp. 46-47, 51-55 (TS Codewordi r OXCART Story.-
p. 10 (S).
OSA History, chap. 20, pp. 46-47 (TS Codeword).
Parangosky interview (S): OSA History. chap. 20. P. 55 (TS Codeword). During this
period, Kelly Johnson was very disappointed with Pratt & Whitney'i work on the 158,
particularly when they shocked him in September 1961 with the news that the engine
would be overweight. underpowered, and late. Johnson, "Archangel log," II September
1961.
ED 129581.6hili1l>1010<25Yrs
IS1
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.