This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design."' Another factor in the rejection of Kelly Johnson's…
  • p. 26 …interview by Donald E. Welzenbach, Corona del Mar. California. 20 May 1985 (S). Johnson, "Log for…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson's revolutionary design a reality, one additional source of support was necessary…
  • p. 42 …When James Killian asked Land to head Project Three, Land had to make a major decision…
  • p. 48 …do the job in Johnson's airplane. And further, 1 overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …a week after he had been authorized to begin the project, Kelly Johnson wrote a 23…
  • p. 69 …project staff) flew LIZ with Kelly Johnson in a small Beechcraft plane piloted by eed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Batlin suggested the method used by Nazi war criminal Hermann Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a "wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
SecrefTSQRN
Chapter 6
285
005653421 UNCLASSIFIED
to reduce expenditures. After much refiguring, project officials de-
cided to decrease the number of deliverable aircraft. Amendment No.
11 to the contract reduced from 12 to 10 the number of A- 12s, for a
total cost of $161.2 million:7
The cancellation of these two A- 12s was offset by an Air Force
order for the development of a supersonic interceptor variant of the
A-12 to serve as a replacement for the North American F- 108A Rapier
interceptor project, which had been canceled in late 1960. With the
assistance of the the Air Force
entered into an agreement with Lockneed to proauce uiree AF-12 air-
craft, based on the A-12 design but modified to carry a second crew-
man and three air-to-air missiles. This effort was called Project
KEDLOCK. The AF-12 (later redesignated the YF-12A) was de-
signed to intercept enemy bombers long before they reached the
United States, and initial Air Force plans envisioned a force of up to
100 of these supersonic interceptors. In fact, only three of these planes
were built and delivered during the 1963-64 time frame because
Secretary of Defense McNamara canceled the program as a cost-cut-
ting measure. The Air Force bore all of the costs of the YF-I2A pro-
ject.; CIA was only involved in helping to write -black" contracts.4
Lockheed was not the only OXCART contractor having trouble
containing costs: Pratt & Whitney was fighting an even bigger battle.
In mid-I961, Pratt & Whitney overruns threatened to halt the entire
OXCART project. At the suggestion of Cdr. William Holcomb in the
office of the Chief of Naval Materiel, Richard Bissell asked the Navy
to assist in funding the 158's development. After hearing Bissell and
Holcomb's suggestion that the J58 might be used in future Navy air-
craft, VAdm. William A. Schoech, Chief of the Navy Materiel
Command that had originally financed the J58 engine, authorized the
transfer of $38 million in end-of-year funds to the project, thus keep-
ing the OXCART's head above water."9 As it turned out, the J58 was
never used in a Navy aircraft.
OSA History. chap. 20. pp. 46-47, 51-55 (TS Codewordi r OXCART Story.-
p. 10 (S).
OSA History, chap. 20, pp. 46-47 (TS Codeword).
Parangosky interview (S): OSA History. chap. 20. P. 55 (TS Codeword). During this
period, Kelly Johnson was very disappointed with Pratt & Whitney'i work on the 158,
particularly when they shocked him in September 1961 with the news that the engine
would be overweight. underpowered, and late. Johnson, "Archangel log," II September
1961.