Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 4 …Scientists and Overhead Reconnaissance 17 The BEACON HILL Report 17 Concern About the Danger of a…
  • p. 14 …view of the "other side of the hill." With the advent of dry film, it became…
  • p. 30 …of this new advisory body." The BEACON HILL Report In 1951 the Air Force sought even…
  • p. 31 …Their head- quarters was located over a secretarial school on Beacon Hill, which soon became the…
  • p. 32 …to implement the ideas of the BEACON HILL Report until the summer of 1953. By this…
  • p. 34 …Created in July 1953, the Intelligence Systems Panel (ISP) included several experts from the BEACON HILL…
  • p. 37 …reconnais- sance needs expressed in the BEACON HILL Report. Theoretically, he explained to the panel, any…
  • p. 41 …H. T. Friis R. Mettler A. G. Hill E. Purcell W. H. Radford E. H. Plesset…
  • p. 44 …6(dli1i>10<25Yrs since the BEACON HILL and Intelligence Systems Panel meetings. (Si James Baker…
  • p. 45 …Having participated in the BEACON HILL Study and the Intelligence Systems Panel, several Project Three members…
  • p. 344 …He headed the Beacon Hill Panel in 1952 and later became director of Lincoln Laboratories. PARANGOSKY…
  • p. 345 …of several advisory panels, including the BEACON HILL project. He helped Baker decide what cameras to…
  • p. 364 …BEACON HILL Report: Problems of Air Force Intelligence and Reconnaissance. Massachusetts Institute of Technology, 15 June…
'OXCART Story.-
005653421 UNCLASSIFIED
SecrefT
Chapter 6
284
EO 129581.61d1[11>1010<25Yrs
(Si
storage capacity, and runway length were insufficient for the
OXCART program, the site's remote location would greatly ease the
task of maintaining the program's security, and a moderate construc-
tion program could provide adequate facilities. Construction began in
September 1960; a C-47 shuttle service ferried work crews from
Burbank to Las Vegas and from Las Vegas to the site.
The new 8,500-foot runway was completed by 15 November
1960. Kelly Johnson had been reluctant to have a standard Air Force
runway with expansion joints every 25 feet because he feared the
joints would set up undesirable vibrations in the speedy aircraft. At
his suggestion a 150-foot wide runway was therefore constructed of
six 25-foot-wide longitudinal sections, each 150 feet long but stag-
gered. This layout put most of the expansion joints parallel to the di-
rection of aircraft roll and reduced the frequency of the joints.
Additional improvements included the resurfacing of 18 miles of
hi g hway leading to the base so that heavy fuel trucks could bring in
the necessary fuel. The need for additional buildings on the base was
met by the Navy. Three surplus Navy hangars were dismantled,
moved, and reassembled on the north side of the base, and more than
100 surplus Navy housing buildings were also transported to
All essential facilities were ready in time for the forecast delivery
date of the first A-12 on 1 August 1961.'
Unfortunately, this delivery date began to slip further and further
into the future. Delays in obtaining the titanium, and later the 158 en-
gines, caused the postponement of the final assembly of the first plane.
Eventually, Kelly Johnson and Agency project officials decided to be-
gin testing without waiting for the 158 engines by using Pratt &
Whitney J75/ I9W engines, designed for the Convair F-106, to test the
A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such
a change, however, meant that the en g ine compartment of the first air-
craft had to be reconfigured to accommodate the J75 en g ine. Lockheed
hoped that this substitution would permit the delivery of the first A-12
by 22 December 1961 and its initial test flight by 27 February 1962.
Lockheed ran into so many technological problems with the
OXCART effort that by October 1961 its costs had swollen to $136
million and were still climbing. Something obviously had to be done
OSA Histbry. chap. 20. pp. 39-40, 43, 51 (TS Codcword)
pp. 7-9 (S).
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.