This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design."' Another factor in the rejection of Kelly Johnson's…
  • p. 26 …interview by Donald E. Welzenbach, Corona del Mar. California. 20 May 1985 (S). Johnson, "Log for…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson's revolutionary design a reality, one additional source of support was necessary…
  • p. 42 …When James Killian asked Land to head Project Three, Land had to make a major decision…
  • p. 48 …do the job in Johnson's airplane. And further, 1 overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …a week after he had been authorized to begin the project, Kelly Johnson wrote a 23…
  • p. 69 …project staff) flew LIZ with Kelly Johnson in a small Beechcraft plane piloted by eed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Batlin suggested the method used by Nazi war criminal Hermann Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a "wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
'OXCART Story.-
005653421 UNCLASSIFIED
SecrefT
Chapter 6
284
EO 129581.61d1[11>1010<25Yrs
(Si
storage capacity, and runway length were insufficient for the
OXCART program, the site's remote location would greatly ease the
task of maintaining the program's security, and a moderate construc-
tion program could provide adequate facilities. Construction began in
September 1960; a C-47 shuttle service ferried work crews from
Burbank to Las Vegas and from Las Vegas to the site.
The new 8,500-foot runway was completed by 15 November
1960. Kelly Johnson had been reluctant to have a standard Air Force
runway with expansion joints every 25 feet because he feared the
joints would set up undesirable vibrations in the speedy aircraft. At
his suggestion a 150-foot wide runway was therefore constructed of
six 25-foot-wide longitudinal sections, each 150 feet long but stag-
gered. This layout put most of the expansion joints parallel to the di-
rection of aircraft roll and reduced the frequency of the joints.
Additional improvements included the resurfacing of 18 miles of
hi g hway leading to the base so that heavy fuel trucks could bring in
the necessary fuel. The need for additional buildings on the base was
met by the Navy. Three surplus Navy hangars were dismantled,
moved, and reassembled on the north side of the base, and more than
100 surplus Navy housing buildings were also transported to
All essential facilities were ready in time for the forecast delivery
date of the first A-12 on 1 August 1961.'
Unfortunately, this delivery date began to slip further and further
into the future. Delays in obtaining the titanium, and later the 158 en-
gines, caused the postponement of the final assembly of the first plane.
Eventually, Kelly Johnson and Agency project officials decided to be-
gin testing without waiting for the 158 engines by using Pratt &
Whitney J75/ I9W engines, designed for the Convair F-106, to test the
A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such
a change, however, meant that the en g ine compartment of the first air-
craft had to be reconfigured to accommodate the J75 en g ine. Lockheed
hoped that this substitution would permit the delivery of the first A-12
by 22 December 1961 and its initial test flight by 27 February 1962.
Lockheed ran into so many technological problems with the
OXCART effort that by October 1961 its costs had swollen to $136
million and were still climbing. Something obviously had to be done
OSA Histbry. chap. 20. pp. 39-40, 43, 51 (TS Codcword)
pp. 7-9 (S).